![UPRENT impulse MUMBAI IP Series User Manual Download Page 18](http://html1.mh-extra.com/html/uprent/impulse-mumbai-ip-series/impulse-mumbai-ip-series_user-manual_1061225018.webp)
16
7
Starting
1. To start the pump, make shore main switch is on
“0” position (1) the switch must first be turned
to the star (2) position, and then turned to the delta (3) position within one second.
2. switch must first be turned to the star (2) position for about 1 second.
3. And then turned to the delta (3) position within one second.
WARNING
Turning the switch too slowly will cause the motor's thermal protection to trip. Return the
switch to the neutral position and switch it on again.