Uponor Smatrix Base PRO R-147 KNX Installation And Operation Manual Download Page 4

This installation and operation manual describes how 
to install and operate the Uponor Smatrix Base PRO 
Gateway Module R-147 KNX.

2.1  Safety instructions

Warnings used in this manual

The following symbols are used in the manual to 
indicate special precautions when installing and 
operating any Uponor equipment: 

W

arning

!

Risk of injury. Ignoring warnings can cause 
injury or damage components.

C

aution

!

Ignoring cautions can cause malfunctions.

Safety measures

Conform to the following measures when installing and 
operating any Uponor equipment:

•  Read and follow the instructions in the installation 

and operation manual.

•  Installation must be performed by a competent 

person in accordance with local regulations.

•  It is prohibited to make changes or modifications 

not specified in this manual.

•  All power supplies must be switched off before 

starting any wiring work.

•  Do not use water to clean Uponor components.

•  Do not expose the Uponor components to 

flammable vapours or gases.

Uponor cannot accept any responsibility for damage 
or breakdown that can result from ignoring these 
instructions.

Power

W

arning

!

The Uponor system uses 50 Hz, 230 V AC 
power. In case of emergency, immediately 
disconnect the power.

Technical constraints

C

aution

!

To avoid interference, keep installation/data 
cables away from power cables of more than 
50 V.

2.2  Correct disposal of this product 

(Waste Electrical and Electronic 
Equipment)

N OT E !

Applicable in the European Union and other 
European countries with separate collection 
systems

This marking shown on the product or its 

literature indicates that it should not be 
disposed with other household wasted at the 

end of its working life. To prevent possible harm to the 
environment or human health from uncontrolled waste 
disposal, please separate this from other types of wastes 
and recycle it responsibly to promote the sustainable 
reuse of material resources.

Household users should contact either the retailer 
where they purchased this product, or their local 
government office, for details of where and how they 
can take this item for environmentally safe recycling.

Business users should contact their supplier and check 
the terms and conditions of the purchase contract. This 
product should not be mixed with other commercial 
wastes of disposal.

2  Preface

UK

CZ

DE

DK

EE

ES

FI

FR

HR

HU

IT

LT

LV

NL

NO

PL

PT

RO

RU

SE

SK

4

U P O N O R   S M AT R I X   B A S E / B A S E   P R O   ·   I N S TA L L AT I O N   A N D   O P E R AT I O N   M A N UA L

Summary of Contents for Smatrix Base PRO R-147 KNX

Page 1: ...12 2016 Uponor Smatrix Base PRO R 147 KNX EN I N STALLATI ON AN D OPERATI ON M AN UAL...

Page 2: ...he KNX gateway module to the Smatrix Base PRO bus 9 4 8 Connect the KNX gateway module to the KNX bus 10 4 9 Connect the KNX bus to DC power 10 4 10 Connect the Smatrix Base PRO system to AC power 11...

Page 3: ...d to or used with non Uponor products parts or components except for those approved or specified by Uponor and does not show evidence of tampering mishandling insufficient maintenance improper storage...

Page 4: ...Uponor system uses 50 Hz 230 V AC power In case of emergency immediately disconnect the power Technical constraints Caution To avoid interference keep installation data cables away from power cables...

Page 5: ...roller and an Uponor Smatrix Base PRO Interface I 147 interface I 147 KNX PSU and PC interface Data point lists for the Base PRO controllers found in this manual ETS tool version 5 or higher software...

Page 6: ...Base PRO bus Ensure that the KNX gateway module can be installed close to the KNX bus Ensure that there is room for the KNX gateway module on a DIN rail Ensure that the KNX gateway module is protected...

Page 7: ...Uponor Smatrix Wave PLUS Interface I 147 is needed to enable en KNX Gateway module Caution A separate power supply is needed for the KNX bus N OT E The KNX gateway module only sends Smatrix Base PRO...

Page 8: ...a public thermostat T 143 registered to the Smatrix Base PRO system as a system device A building management system BMS is connected to the KNX bus The ETS configuration tool is used to setup the KNX...

Page 9: ...r Uponor Smatrix Base Base PRO for more information 4 Connect the wires from the thermostat bus on the Smatrix Base PRO controller to the lower connector on the KNX gateway module terminal on the cont...

Page 10: ...2 Ensure that the power is disconnected from the KNX bus 3 Connect the wires from the KNX bus to the KNX connector on the KNX gateway module terminal on the controller to terminal red on the KNX gatew...

Page 11: ...interface I 147 GPI Heating Cooling switch Supply water controller Disable KNX Gateway Enable Integration To connect the enable the KNX gateway module in interface I 147 1 Go to the Integration menu M...

Page 12: ...file for more information Locate the data point lists for the Base PRO controllers found in this manual 5 2 ETS product data file To configure the KNX gateway module and other connected Smatrix Base P...

Page 13: ...ng to cooling mode The changes to the settings are done to avoid possible conflicts in the touch screen interface if the setpoint is transmitted from the KNX system i e BMS Building Management System...

Page 14: ...ateway module has lost communication with an Uponor controller all actuator data points in the KNX will be displaying off until the issue is resolved The actual physical status of the actuator will re...

Page 15: ...Uponor system For this setup to work without setpoint conflicts the KNX thermostat ETS configuration flags for setpoints must be changed from WRITE to TRANSMIT Setpoints are now communicated from the...

Page 16: ...ffset Cooling curve offset 12 DPT_Value_Temp X X Circuit 4 supply temperature Measured supply temperature 13 DPT_Value_Temp X X Circuit 4 heating curve offset Heating curve offset 14 DPT_Value_Temp X...

Page 17: ...les the KNX gateway module to overwritte a data point with read data after sending a READ or READ ON INIT request to another data point READ ON INIT ROI Enables KNX gateway module to do a read on init...

Page 18: ...NX The KNX LED is always on Red on error or software initialisation after power on Green on KNX gateway module is connected and setup vid KNX Red or green flashing data is received via KNX bus Modbus...

Page 19: ...reset and maybe solve the problem When reset the KNX gateway module gets the configuration from the KNX bus and pushes it to the Smatrix Base PRO controllers By doing so it is ensured that any faults...

Page 20: ...ferring to an actuator parameter set to Activated Uponor thermostat However if several actuators are controlled by the same Uponor thermostat only the actuator parameter with the lowest index number i...

Page 21: ...e alarm should be reset automatically when the KNX gateway module communicated with the restarted Uponor controller again How long it takes is dependent on how many Uponor controllers are present in t...

Page 22: ...hat the Smatrix Move PRO controller is powered up 2 Check the Smatrix Move PRO controller Modbus wiring and ensure it is correct 8 KNX configuration of Uponor controller The KNX gateway module has bee...

Page 23: ...Directive 2014 30 EU RoHS Directive 2011 65 EU EN 50581 2012 EN 50491 5 1 2010 EN 50491 5 2 2010 EN 50491 5 3 2010 EN 61000 6 2 2005 EN 61000 6 3 2007 A1 2011 KNX KNX connection 29 V DC KNX bus curren...

Page 24: ...7 R 147 A B B A A A A A B B B B Bus 8 3 Dimensions 98 5 45 22 5 22 5 18 60 30 5 51 62 50 5 mm UK CZ DE DK EE ES FI FR HR HU IT LT LV NL NO PL PT RO RU SE SK 24 UPONOR SMATRIX BASE BASE PRO INSTALLATIO...

Page 25: ...UK CZ DE DK EE ES FI FR HR HU IT LT LV NL NO PL PT RO RU SE SK 25 UPONOR SMATRIX BASE BASE PRO INSTALLATION AND OPERATION MANUAL...

Page 26: ...AB MRY Virsbo Sweden Uponor Corporation www uponor com Uponor reserves the right to make changes without prior notification to the specification of incorporated components in line with its policy of c...

Reviews: