Uponor Smatrix Base PRO R-147 KNX Installation And Operation Manual Download Page 20

7.4  LED error codes

KnX 

error

 

CodeS

The table below shows error codes for the KNX bus and describes possible solutions. A common cause of a problem though may be due 
to faulty wiring.

Error code

Description

Probable cause

Solutions

1

Get ETS® configuration

The KNX gateway module has not yet 
received configuration from the ETS® tool.

Ensure the KNX gateway module is installed correctly and 
that it has been programmed by the ETS® tool.

If the error persists, perform a hard reset on the KNX gateway 
module. 

See section 7.3 Resetting the KNX gateway module 

for more information

2

Invalid ETS® flag

An invalid manual configuration flag has 
been set on KNX group objects in ETS®.

Ensure all manual configuration flags on KNX group objects 
in ETS® are correct.

Example: Activated data points which are only readable from 
KNX must have READ or TRANSMIT flags set.

If many changes had been done in ETS® before the 
error occured, Uponor recommends to remove all 
COMMUNICATION flags from multiple group objects at once. 
Then to add them one by one until the error occurs again.

See section 6 System setup for more information.

3

Incorrect ETS® actuator 
configuration

A parameter setting in the ETS® for 
actuator control is incorrect.

When using KNX thermostats

Ensure that all controller parameter settings, which are set 
to “Use with actuator X” (where X is the controller channel 
number), is referring to an actuator parameter set to 
“Activated, KNX thermostat”.

When using Uponor thermostats

Ensure that all controller parameter settings, which are set 
to “Use with actuator X” (where X is the controller channel 
number), is referring to an actuator parameter set to 
“Activated, Uponor thermostat”.

However, if several actuators are controlled by the same 
Uponor thermostat, only the actuator parameter with the 
lowest index number is required to be set to “Activated, 
Uponor thermostat” and still maintain functionality. All 
other acutator zone settings (registering a thermostat to an 
acutator channel) are done at the controller in question.

4

Occupied thermostat 
channel

A KNX thermostat is registered on the 
same channel as an Uponor thermostat.

1.  Ensure that an Uponor thermostat is not registered to a 

channel used by a KNX thermostat.

2.  Unregister the Uponor thermostat from the controllers or 

reprogram the KNX thermostat to an unused channel in 
the ETS® tool.

3.  If the error persists, perform a hard reset on the KNX 

gateway module. 

See section 7.3 Resetting the KNX 

gateway module for more information.

5

Slave channel not 
available

A KNX thermostat is registered to a 
channel on an unavailable slave module.

Ensure that the controller has a slave module installed (the 
controller only have 6 channels by default).

If a slave module isn’t available, allocate the KNX thermostat 
to another channel in the ETS®.

6

KNX Thermostat lost

A KNX thermostat has timed out. The KNX 
gateway module hasn’t received data from 
a KNX thermostat for at least 6 hours.

1.  Ensure that the KNX thermostats are connected to the 

KNX bus.

2.  Ensure that the parameter settings for the KNX 

thermostats in the ETS® are correct.

3.  Ensure that the thermostats, if possible, are set to 

send room temperature cyclically. Otherwise decrease 
the temperature difference parameter which is allowed 
before sending a new value via the KNX bus.

UK

CZ

DE

DK

EE

ES

FI

FR

HR

HU

IT

LT

LV

NL

NO

PL

PT

RO

RU

SE

SK

2 0

U P O N O R   S M AT R I X   B A S E / B A S E   P R O   ·   I N S TA L L AT I O N   A N D   O P E R AT I O N   M A N UA L

Summary of Contents for Smatrix Base PRO R-147 KNX

Page 1: ...12 2016 Uponor Smatrix Base PRO R 147 KNX EN I N STALLATI ON AN D OPERATI ON M AN UAL...

Page 2: ...he KNX gateway module to the Smatrix Base PRO bus 9 4 8 Connect the KNX gateway module to the KNX bus 10 4 9 Connect the KNX bus to DC power 10 4 10 Connect the Smatrix Base PRO system to AC power 11...

Page 3: ...d to or used with non Uponor products parts or components except for those approved or specified by Uponor and does not show evidence of tampering mishandling insufficient maintenance improper storage...

Page 4: ...Uponor system uses 50 Hz 230 V AC power In case of emergency immediately disconnect the power Technical constraints Caution To avoid interference keep installation data cables away from power cables...

Page 5: ...roller and an Uponor Smatrix Base PRO Interface I 147 interface I 147 KNX PSU and PC interface Data point lists for the Base PRO controllers found in this manual ETS tool version 5 or higher software...

Page 6: ...Base PRO bus Ensure that the KNX gateway module can be installed close to the KNX bus Ensure that there is room for the KNX gateway module on a DIN rail Ensure that the KNX gateway module is protected...

Page 7: ...Uponor Smatrix Wave PLUS Interface I 147 is needed to enable en KNX Gateway module Caution A separate power supply is needed for the KNX bus N OT E The KNX gateway module only sends Smatrix Base PRO...

Page 8: ...a public thermostat T 143 registered to the Smatrix Base PRO system as a system device A building management system BMS is connected to the KNX bus The ETS configuration tool is used to setup the KNX...

Page 9: ...r Uponor Smatrix Base Base PRO for more information 4 Connect the wires from the thermostat bus on the Smatrix Base PRO controller to the lower connector on the KNX gateway module terminal on the cont...

Page 10: ...2 Ensure that the power is disconnected from the KNX bus 3 Connect the wires from the KNX bus to the KNX connector on the KNX gateway module terminal on the controller to terminal red on the KNX gatew...

Page 11: ...interface I 147 GPI Heating Cooling switch Supply water controller Disable KNX Gateway Enable Integration To connect the enable the KNX gateway module in interface I 147 1 Go to the Integration menu M...

Page 12: ...file for more information Locate the data point lists for the Base PRO controllers found in this manual 5 2 ETS product data file To configure the KNX gateway module and other connected Smatrix Base P...

Page 13: ...ng to cooling mode The changes to the settings are done to avoid possible conflicts in the touch screen interface if the setpoint is transmitted from the KNX system i e BMS Building Management System...

Page 14: ...ateway module has lost communication with an Uponor controller all actuator data points in the KNX will be displaying off until the issue is resolved The actual physical status of the actuator will re...

Page 15: ...Uponor system For this setup to work without setpoint conflicts the KNX thermostat ETS configuration flags for setpoints must be changed from WRITE to TRANSMIT Setpoints are now communicated from the...

Page 16: ...ffset Cooling curve offset 12 DPT_Value_Temp X X Circuit 4 supply temperature Measured supply temperature 13 DPT_Value_Temp X X Circuit 4 heating curve offset Heating curve offset 14 DPT_Value_Temp X...

Page 17: ...les the KNX gateway module to overwritte a data point with read data after sending a READ or READ ON INIT request to another data point READ ON INIT ROI Enables KNX gateway module to do a read on init...

Page 18: ...NX The KNX LED is always on Red on error or software initialisation after power on Green on KNX gateway module is connected and setup vid KNX Red or green flashing data is received via KNX bus Modbus...

Page 19: ...reset and maybe solve the problem When reset the KNX gateway module gets the configuration from the KNX bus and pushes it to the Smatrix Base PRO controllers By doing so it is ensured that any faults...

Page 20: ...ferring to an actuator parameter set to Activated Uponor thermostat However if several actuators are controlled by the same Uponor thermostat only the actuator parameter with the lowest index number i...

Page 21: ...e alarm should be reset automatically when the KNX gateway module communicated with the restarted Uponor controller again How long it takes is dependent on how many Uponor controllers are present in t...

Page 22: ...hat the Smatrix Move PRO controller is powered up 2 Check the Smatrix Move PRO controller Modbus wiring and ensure it is correct 8 KNX configuration of Uponor controller The KNX gateway module has bee...

Page 23: ...Directive 2014 30 EU RoHS Directive 2011 65 EU EN 50581 2012 EN 50491 5 1 2010 EN 50491 5 2 2010 EN 50491 5 3 2010 EN 61000 6 2 2005 EN 61000 6 3 2007 A1 2011 KNX KNX connection 29 V DC KNX bus curren...

Page 24: ...7 R 147 A B B A A A A A B B B B Bus 8 3 Dimensions 98 5 45 22 5 22 5 18 60 30 5 51 62 50 5 mm UK CZ DE DK EE ES FI FR HR HU IT LT LV NL NO PL PT RO RU SE SK 24 UPONOR SMATRIX BASE BASE PRO INSTALLATIO...

Page 25: ...UK CZ DE DK EE ES FI FR HR HU IT LT LV NL NO PL PT RO RU SE SK 25 UPONOR SMATRIX BASE BASE PRO INSTALLATION AND OPERATION MANUAL...

Page 26: ...AB MRY Virsbo Sweden Uponor Corporation www uponor com Uponor reserves the right to make changes without prior notification to the specification of incorporated components in line with its policy of c...

Reviews: