Note
To open the cold water/primary flow strainer, use internal
hexagon (
6 mm
).
The strainer collects dirt and its filter can be removed for inspection
and cleaning.
1.5 Filling, flushing and venting
The filling and draining valve (A) on the primary heating can be used
for filling and flushing of the heating system.
Ventilation is done by turning the ventilation screws (B).
1.6 Tightness testing
Warning!
Leaking connections can cause personal injury and
property damages.
1.7 Hydraulic installation
Warning!
Risk of injury due to improper installation!
Ensure that the hydraulic connections are made in a
correct way. Leaking connections can cause personal
injury.
Note
Use the hydraulic diagram in the end of the document as
an installation guide.
•
Do not reduce the specified pipe cross-sections. The
connections for optional components (e.g. meters) are capped
with black plastic adaptors in the device.
•
Replace the plastic fittings with stainless steel 1.4401 pipes if no
optional components should be connected. These can be
obtained from the supplier.
•
Ensure to connect the heating supply and return as well as the
hot and cold water correctly.
•
Install a filling and draining valve on site at a suitable central
point to fill the central heating system.
1.8 Electrical installation
Warning!
Risk of electric shock if touching the components! The
unit operates with a 230 V AC voltage.
Warning!
Required electrical connections and installations,
commissioning and maintenance must only be performed
by an authorised person in accordance with local
standards and regulations.
Note
Use the wiring diagrams in the end of the document as
installation guides.
1.9 Visual inspection
Caution!
Improper commissioning can lead to property damage.
Note
If an installation error is found during visual inspection,
temporarily stop commissioning and rectify the error.
Complete commissioning by following these steps:
1.
Make a complete check up of the installation prior to
commissioning:
1.1.
Make sure that the hydraulics are connected correctly
1.2.
Check that any dirt accumulated during installation and/or
dust on the unit has been removed properly. Check
strainers and, if necessary, flush/clean them.
1.3.
Check the tightness of all seals on pipe - and device
connections and tighten them if necessary. When
tightening connections, always lock the opposite side
1.4.
Optional: Check that all electrical connections have been
made correctly, including polarity of the mains connection
and that grounding is assured.
2.
Check that the installation is filled/flushed and vented.
4
|
Combi Port Base
|
Quick guide
EN
Summary of Contents for KaMo Combi Port Base
Page 13: ...SI0000365 1 2 3 4 1 2 SI0000366 5 6 7 SI0000367 1 3 CD0000306 Combi Port Base Quick guide 13...
Page 14: ...SI0000368 1 4 A 1 4 B A 1 6 2 h P 1 5 CW HM 14 Combi Port Base Quick guide...
Page 15: ...1 7 SI0000369 Combi Port Base Combi Port Base TWB Combi Port Base Quick guide 15...
Page 17: ...Combi Port Base Quick guide 17...
Page 18: ...18 Combi Port Base Quick guide...
Page 19: ...Combi Port Base Quick guide 19...