Uponor 102628 Installation And Operation Manual Download Page 4

4  l  Uponor Combi Port PRO XU  l  Installation manual

In the case of installations in the public sector (multi family homes, 
hotels, retirement homes, hospitals, sports halls, etc.) care must be 
taken to ensure that the heated drinking water temperature does not 
fall below 60°C and the circulating water re-entering the unit reaches 
a minimum temperature of 55°C. This requires accurate calculation 
and precise adjustment of the circulating line.

The system is maintained in compliance with DIN EN 806-5 or, outside 
Germany, in accordance with national regulations or standards.

Use-related wear of wearing parts, such as pumps, built-in valves 
(moving parts, PM valves, etc.) are not considered as defects.

We recommend a maintenance cycle especially for example for the 
built-in heat exchanger (test, dirt, sludge, lime), PM valve (functional 

WHVWGLUW¿OWHUVKXWRႇYDOYHVIXQFWLRQDOWHVWYDOYHVVXFKDVD

thermostatic lead module, thermostatic hot water temperature limiter, 

]RQHYDOYHVLQMHFWLRQYDOYHGLႇHUHQWLDOSUHVVXUHUHJXODWRUSXPS

volume measuring unit, thermal premixer or other parts.

5  Please instruct the system users properly and provide them with 

these installation and operating instructions together with the 
inventory documents.

 

Please check that the units are complete. Any screws that 
are loosened during transport should be retightened.

 

In the event of leaks that occur during the pressure test, be 

VXUHWRGHSUHVVXULVHWKHXQLWEHIRUHUHSODFLQJDQ\DႇHFWHG

components.

 

Never remove individual parts of the unit (or any other built-in 
components) while the system is still under pressure (risk of injury).

 

If you have any questions about correct operation or function, 
please contact your supplier. Of course you are also welcome 
to contact us directly anytime.

1.1 

Validity of the instructions

These installation and operating instructions apply exclusively to 
the manufacturer’s unit. The type can be found on the ID plate.

The ID plate is located on the base plate of the unit. The ID plate 
contains the following information. 

•  Sales

•  Created by

•  Device type

•  Technical data

•  Year built

•  Serial number

•  Order number

•  Production location

1.2 

ID plate (example)

Device type:

Combi Port PRO XU

Hz-VI temperature: 

max. 95°C

7::ÀRZUDWH

Exchanger type 1; 15 l/min

Pressure level Hz/TWW: 

PN 10/PN 6

Year built:

2020

Serial number: D-10-0026036

Order number: 102628 

Made in Germany

1.3 

Related documents and regulations

•  Additional documents are valid in conjunction with 

these installation and operating instructions.

•  When carrying out service work on the unit, it is essential to 

observe all instructions for supplementary components and 
components of the heating system.

•  In all service work pay attention to:

-  the recognised technical rules for safe and 

professional operations

-  the statutory regulations for accident prevention

-  the statutory environmental protection regulations

-  the stipulations of employer’s liability insurance associations

-  the relevant safety conditions of the DIN, EN, DVGW, DWGW, 

VDE and AGFW standards

-  the relevant national and EU regulations for other countries

 DQGWKHUHOHYDQWVSHFL¿FDWLRQVIRUWKHUHFRJQLVHGUXOHV

of engineering

1.4 

Document retention

•  You should keep these instructions and all other applicable 

documents in a safe place, so that they are always available.

•  Make sure to hand over all the documents to the operator.

1.5 

Correct operation

The heat interface unit is intended exclusively for drinking water 
heating, control of the downstream domestic heating system and 
the measurement of heating energy and cold water consumption 
for an apartment or similar unit.

Any other or further use is considered improper use. The 
manufacturer/supplier is not liable for resulting damages. The risk 
is borne solely by the user. Intended use also includes observance 
of all relevant documents and compliance with the inspection and 
maintenance conditions.

Under no circumstances should you deviate from the values given 
in the technical data.

1.6 

Personnel and qualifications

The heat interface unit may be operated by the operator or by 
personnel authorised by the operator. Service work (assembly, 
commissioning and maintenance) on the heat interface unit 
requires specialist knowledge. In general, only authorised specialist 
tradesmen are allowed to carry out service work on the heat 
interface unit. 

Summary of Contents for 102628

Page 1: ...Uponor Combi Port PRO XU EN Installation and Operation Manual...

Page 2: ...or rail 12 3 2 Mounting connection pipes for UFH manifold 12 3 3 Mounting station 13 3 4 Mounting UFH manifold 13 RQQHFWLRQ XQGHU RRU KHDWLQJ SLSHV 13 3 6 Connection single room controller 14 3 7 Mou...

Page 3: ...performing any work on the controller or the components connected to it disconnect the controller from the power supply as instructed The outlets are also in an inactive state under mains voltage We w...

Page 4: ...Technical data Year built Serial number Order number Production location 1 2 ID plate example Device type Combi Port PRO XU Hz VI temperature max 95 C 7 RZ UDWH Exchanger type 1 15 l min Pressure leve...

Page 5: ...ly check the water temperature with a gauge before touching it 1 13 Leaks If leaks occur you must follow the instructions below ORVH DOO VKXW R YDOYHV LPPHGLDWHO Repair the lick in the appropriate man...

Page 6: ...2 is a brass valve for the control of the volu PH RZV RI GRPHVWLF KRW ZDWHU RYHU D VWDLQOHVV VWHHO SODWH KHDW H FKDQJHU LWK DQ RUL FH RZ UHVWULFWLRQ SODWH RQ WKH KHDWLQJ VLGH WKH 30 FRQWUROOHU VXSSOL...

Page 7: ...roportional volume controller PM controller 4 Sensor pocket HM M10x1 wet diving 5 Air vent 6 Electric box 7 HM distance piece 9 Strainer 12 Thermostatic temperature retention module TTV 13 DHW tempera...

Page 8: ...he installation of Combi Port PRO XU will start with back plate or ball valve rail 1 When all lines have to be connected from top to the Combi Port PRO XU then the ball valve rail has to be used 2 Whe...

Page 9: ...wall cabinet are described in chapter Installation L HUHQW VLQJOH URRP FRQWUROOHU FDQ EH FRQQHFWHG 6HH DYDLODEOH controler later in this chapter 2 5 3 Connecting pipes When connection from down is re...

Page 10: ...matrix is a fully equipped range of components for room temperature control optionally via radio or wired The unique auto balancing technology eliminates the need for manual balancing of the loops The...

Page 11: ...IROG 6LQJOH URRP FRQWURO XQLW Smatrix is mounted and wired at the manifold System components 1 Combi Port PRO XU 2 Connecting pipes to down and ball valves 3 Single room controller 4 UFH manifold 1 2...

Page 12: ...to connect pipes variable on top down or both top down then the back plate to be used For pipe connections all on top the rail to be mounted In this mounting instruction the case A will be shown as th...

Page 13: ...ail A Note Tightness of the screwed connections must be checked 3 4 Mounting UFH manifold 1 Mark for drilling wholes for UFH manifold Note Pay attention to horizontal alignment 2 Drill holes 3 Screw V...

Page 14: ...ntroller above the manifold on desired L brackets 2 Install the actuators on the UFH manifold return Electrical connection see chapter 4 3 Note Install the Interface unit allways outside the cabinet w...

Page 15: ...ting supply and return as well as the hot and cold water correctly 7R OO WKH FHQWUDO KHDWLQJ V VWHP LQVWDOO D OOLQJ DQG GUDLQLQJ valve on site at a suitable central point Observe the hydraulic diagram...

Page 16: ...e g DIN VDE 0100 540 Please connect the station as follow 1 Connect Combi Port XU electrically see wiring diagram 2 Connect individual room controller please follow to the corresponding instruction S...

Page 17: ...the connections When tighte ning connections always lock the opposite side Vent the accumulated air in the heat interface unit by opening the venting screw Observe the system operating pressure To co...

Page 18: ...Please note Make sure not to bend or break the capillary line Using a welding wire slide out the locking tabs next to the adjustment number on the left and right in the direction of the union nut If...

Page 19: ...the number has to be agreed All residential units that are more than 5 meters from the line should be equipped with a TTV If a circulation is mounted a TTV is not required TTV is included in the scop...

Page 20: ...min Wilo Yonos PARA RS 15 6 25 6 30 6 1 230 V Rp Rp 1 Rp 1 p kPa H m H P1 W Q m h Q Q Q l s Q Q Q Igpm Q Q Q m h Q Q max m ax LOR RQRV 3 5 56 S F FRQVWDQW 0 0 5 1 0 1 5 2 0 2 5 3 0 0 0 2 0 4 0 6 0 8 0...

Page 21: ...unscrewed the valves will shoot out of the thread Never tum the valves counter clockwise more than 4 times CLOSE 1 2 3 4 OPEN 0 25 x 1 5 L min Room heating circuit data Raum Heizkreis Daten Ruimte en...

Page 22: ...SOHWHO RSHQ WKH E SDVV WWLQJ 3 Allen key 6 mm V D UHVXOW ZDWHU RZV IURP WKH OLQH YLD WKH E SDVV 3 QG RI XVKLQJ ORVLQJ WKH E SDVV WWLQJ 3 Allen key 6 mm Assemble the protective cap hexagon 32 mm 4 12 F...

Page 23: ...ter This enables you to dispense unlimited amounts of hot water Restrictions are only imposed by the central heating The heating lines or heat exchangers are permanently maintained at a basic temperat...

Page 24: ...heating return E Secondary heating supply F Secondary heating return Malfunctions and maintenance A visual inspection is required every 3 to 6 months The device seal must be checked If drops form or w...

Page 25: ...15 80 30 50 1 3 4 Euro 7 x 3 4 Euro 460 355 87 73 385 336 50 215 80 30 50 1 3 4 Euro 8 x 3 4 Euro 510 355 87 73 435 336 50 215 80 30 50 1 3 4 Euro 9 x 3 4 Euro 560 355 87 73 485 336 50 215 80 30 50 1...

Page 26: ...allation manual O K K K O Z K K K O K O K O 7 6 WHP O O O O O K K K K K K K O E E O Z Z Z Z O Z E O Z Z K K K K Z Z Z Z 7 6 O O O O Z Z Z Z Z Z Z Z Z Z Z K K K K E E E O O O O O K K K K K K K K Z 6 3...

Page 27: ...Uponor Combi Port PRO XU l Installation manual l 27 6 5 Ball valves on rail top 6x 6 6 Flushing valve O O O O Z Z Z Z K K E Z Z Z O E Z E O O K K E O Z Z K O K Z Z E...

Page 28: ...KHDWLQJ YROXPH RZ SDVVHV WKURXJK the heat exchanger KHFN WKH YROXPH RZ GXULQJ PD LPXP GLVSHQVLQJ using heat meters Combi Port PRO XU 15 l min Combi Port PRO XU 21 l min Heat meter type not supported...

Page 29: ...l head setting Actuator for second safety not connected electrically Actuator for second safety closed without current Connect this electrically Setting KV value of zone valve is not correct Check the...

Page 30: ...15 20 25 5 FNODXIWHPSHUDWXU DSIOHLVWXQJ LWHU PLQ PD LPXP PD LPXP 8 Performance curves Primary heating demand and return temperatures Heating side primary Primary heating demand litre h Pressure lasse...

Page 31: ...400 UXFNYHUOXVW EDU Z Primary heating demand and return temperatures PD SULPDU RZ UDWH O K 30 YDOYH Hot water requirement litre h Pressure loss bar Primary heating demand litre h Return temperature C...

Page 32: ...45 5 10 15 20 25 5 FNODXIWHPSHUDWXU DSIOHLVWXQJ LWHU PLQ PD LPXP PD LPXP Primary heating demand and return temperatures Heating side primary Primary heating demand litre h Pressure lasses e g 0 05 ba...

Page 33: ...400 UXFNYHUOXVW EDU Z Primary heating demand and return temperatures PD SULPDU RZ UDWH O K 30 YDOYH Hot water requirement litre h Pressure loss bar Primary heating demand litre h Return temperature C...

Page 34: ...34 l Uponor Combi Port PRO XU l Installation manual...

Page 35: ...Uponor Combi Port PRO XU l Installation manual l 35...

Page 36: ...PDNH FKDQJHV ZLWKRXW SULRU QRWL FDWLRQ WR WKH VSHFL FDWLRQ RI LQFRUSRUDWHG FRPSRQHQWV LQ OLQH ZLWK LWV SROLF RI FRQWLQXRXV LPSURYHPHQW DQG GHYHORSPHQW 1096066 01 2020 Production Uponor KeL Uponor GmbH...

Reviews: