Uponor Combi Port PRO XU l Installation manual l 13
3.3
Mounting station
1
6FUHZVWDWLRQWRWKHZDOOZLWKHQFORVHG¿[LQJPDWHULDO
Note
The 3/4 “ connection of the station (3/4“ swivel nut) must
be screwed to the ball valves on the rail (3/4 “FT).
(QFORVHGÀDWJDVNHWVPXVWEHLQVHUWHGEHIRUHMRLQLQJ7KH¿WWLQJVDUH
to be tightened by tightening (detail A)
Note
Tightness of the screwed connections must be checked!
3.4
Mounting UFH manifold
1
Mark for drilling wholes for UFH manifold.
Note
Pay attention to horizontal alignment!
2
Drill holes.
3
Screw Vario S manifold to the wall. Connect supply and return of
the Vario S manifold to the ball valves on the station.
3.5
Connection underfloor heating pipes
Please consider:
Construction and installation of underfloor heating acc
EN 1264.
&RQQHFWLRQRIXQGHUÀRRUKHDWLQJSLSHVRQWKHPDQLIROG
Protocol the loop lengths of each loop.
SW 24
SW 30