uno.
Uno International Ltd.
Stepper Control Board Manual
13/21
6. Scheduling
You can choose to run any chain at any intervals - as long as the computer is on, the Boxer Pump Controller
program is running and the pump is powered up.
Right click on the New Project and choose Scheduling or from the File drop down menu choose Scheduling.
Choose the chain you would like to schedule.
Define the start time and the intervals in hours and minutes you would like the chain to run.
Press Add to add the chain to your scheduling.
7. Saving your settings
You can quickly generate many protocols from one master protocol by changing various functions, their order or
value, and save into any position on your hard drive. Use the "Save As" function to save the modified protocols.