background image

P a g e

 | 2

 
 

 

Manuel Fuel Feeding, ÜKY/W Hot Water Boiler User Manual 

INTRODUCTION 

 

 

We would like to thank you for your choice of UNMAK manual feeding solid fuel 

boilers. Please read the user manual carefully before installing and operating your 

product and keep the user manual for the duration of the product use. Do not 

touch or mix any part of the product except where permitted in the user manual. 

The  installation,  maintenance  and  service  of  the  boiler  requires  a  specialist 

technical team. 

These operating instructions and regulations should be considered for the installation of the boiler, 

selection of the location for installation, installation of the boiler water installation and the design of 

the chimney. 

UNMAK  boilers  are  high-efficiency,  steel-based  hot  water  boilers  designed  to  burn  only  solid  fuel. 

These boilers are only used for heating of central heating, not suitable for direct use of water. However, 

it can produce hot water with the help of a water heater or heat exchanger. The energy required for 

domestic water will be taken from the boiler’s energy. 

UNMAK boilers convert the chemical energy of the fuel into heat energy by burning and load it onto 

the water which is the heating fluid. Excessive fuel overcharging to the combustion chamber will cause 

energy loss and will take longer to burn. 

 

 

User manual should be read carefully and stored with the associated warranty certificate 

for the life of the boiler. 

 

SHIPPING AND TRANSPORTATION 

 
UNMAK solid fuel boilers are manufactured from thick sheet. Boilers are sent in a complete package. 

1. Boiler Group: It is shipped with boiler insulation and outer jacket covered. 

2. Accessories: Draft regulator and its chain situated in ash box. 

Safe transport of the product 

Solid fuel boilers are heavy products, so care should be taken when transporting the boiler to the place 

where it will be installed. The equipment used to lift and transport the product must therefore be of 

sufficient capacity. 

Summary of Contents for UKY/W

Page 1: ...Manuel Feeding Wood Fired Boiler User Manual NL SOY Yap Malzemeleri Sanayi ve Ticaret Ltd ti Pancar Organize Sanayi B lgesi 2 Etap No 2 Torbal ZM R Tel 90 444 35 32 Fax 90 232 469 2412 www unmak com...

Page 2: ...ION PLACE 3 SAFETY PRECAUTIONS 5 ELECTRICAL INSTALLATION INSTRUCTIONS 6 BOILER FEATURES 7 RULES FOR HEATING INSTALLATION 8 USAGE AND INSTALLATION OF DRAFT REGULATOR 11 START UP 12 INFORMATION ON COMBU...

Page 3: ...able for direct use of water However it can produce hot water with the help of a water heater or heat exchanger The energy required for domestic water will be taken from the boiler s energy UNMAK boil...

Page 4: ...tion combustion and maintenance of the boiler It must be spaced from the wall for service needs For this purpose the dimensions in the paragraph titled Installation location dimensions must be applied...

Page 5: ...the boiler room boiler room All electrical and water installations must be carried out by authorized plumbers in accordance with all applicable legal and technical rules and regulations The fuels to b...

Page 6: ...never be used It should be plastered inside and outside of the rectangular chimney It should be ensured that fresh air is continuously introduced into the area where the boiler is installed Reference...

Page 7: ...the outside dimensions of the boiler Thanks to the base the boiler is protected from the water that can accumulate on the ground The fire should not be approached when the lid of the burning boiler i...

Page 8: ...ustion Chamber Depth mm 430 500 430 510 Combustion Chamber Volume dm3 47 7 65 7 94 6 112 2 Combustion Chamber Dimensions mm 150 300 180 355 190 500 Water Volume lt 45 70 80 100 Boiler Weight kg 185 23...

Page 9: ...the circulation pump is installed the failure of the electrical connections to come down will eliminate the problem of entering the water into the pump Perpendicular installation of the shaft should a...

Page 10: ...ere and the air in the system is discharged It is recommended to use separate expansion tanks according to their capacities for each boiler in the installation That is it is not correct to connect the...

Page 11: ...measures are taken after the first filling there is no damage caused by the oxygen in the water Oxidation is mostly caused by oxygen which is involved in the heating water during operation Warning ag...

Page 12: ...to the threads and screw the control into the the tapping securely but not too tightly as the threads may be demaged if the control is turned too far Carefully insert the arm into the hole from right...

Page 13: ...as a general rule the air supplied to the fuel must be at a certain rate The air required for a certain amount of fuel should not be too much If the amount of air which is changed depending on the ty...

Page 14: ...diagram below Horizontal connections and equipment such as elbows should be avoided A vertical steel pipe should not be used as a chimney the chimney must have an inside and an outer surface The oute...

Page 15: ...ends on the type of fuel used and the amount of combustion air If it is understood that the outlet water temperature can not rise to the usual values in usual conditions the boiler surfaces are treate...

Page 16: ...re are no holes or cracks in any part of the boiler If it is not enough yet consult your abdomen Have your chest isolated Excess fuel consump tion Poor quality fuel High chimney draft Excess air Insuf...

Page 17: ...ted Add fuel to the winner Panel writes Ht2 error Temperature sensor The temperature sensor is not installed or may be removed The temperature sensor may be faulty Fit the heat sensor firmly Call a se...

Reviews: