Q3 1000-2000A
16
Direct power connection
Phase
L1
Bolt X10:16
Phase
L2
Bolt X10:15
Phase
L3
Bolt X10:14
Note:
L1,L2,L3 - clockwise rotating field
Protecting earth - PE connection
To work without PE connection is for-
bidden !!!
Q3 x/x-
current type
Power choke
KD- three phasecurrent
K - phase choke
Fuses A
Super fast acting installed
1000
KU240 -1000
6 x 1000 A FF
1500
KU240 -1500
12 x 1000 A FF
2000
KU240 - 2000
12 x 1000 A FF
P
o
w
e
r
co
nn
e
ct
io
n
Line protection
Mains choke
with filter
Transformer protection
Power connection with an auto-transformer
Transformer performance
1.1 x continuous motor power
Secondary voltage
0.9 x motor power
Transformer fuses
Slow acting
Observe the switch-on current!!!
Input fuses
F1, F2, F3
rf. to the table above
Attention:
If the secondary voltages produced by the transformer are inferior to 60% the
voltage watchdog has to be adapted. These modifications may only be effected
in the factory and thus, the voltages have to be indicated on order.
Watchdog power connection
BTB inactive
dark LED
>>> missing phase
>>> wrong rotating field