background image

-10-

COMBUSTIBLE WALL CHIMNEY CONNECTOR PASS-THROUGHS

Method  A.  12”  (304.8  mm)  Clearance  to  Combustible  Wall 

Member: Using a minimum thickness 3.5” (89 mm) brick and a 

5/8”  (15.9  mm)  minimum  wall  thickness  clay  liner,  construct  a 

wall pass-through.  The clay liner must conform to ASTM C315 

(Standard  Specification  for  Clay  Fire  Linings)  or  its  equivalent. 

Keep a minimum of 12” (304.8 mm) of brick masonry between 

the  clay  liner  and  wall  combustibles.    The  clay  liner  shall  run 

from the brick masonry outer surface to the inner surface of the 

chimney flue liner but not past the inner surface.  Firmly grout or 

cement the clay liner in place to the chimney flue liner.  

Method  B.  9”  (228.6  mm)  Clearance  to  Combustible  Wall 

Member: Using a 6” (152.4 mm) inside diameter, listed, factory-

built Solid-Pak chimney section with insulation of 1” (25.4 mm) or 

more, build a wall pass-through with a minimum 9” (228.6 mm) 

air space between the outer wall of the chimney length and 

wall combustibles.  Use sheet metal supports fastened securely 

to wall surfaces on all sides, to maintain the 9” (228.6 mm) air 

space.    When  fastening  supports  to  chimney  length,  do  not 

penetrate  the  chimney  liner  (the  inside  wall  of  the  Solid-Pak 

chimney).  The inner end of the Solid-Pak chimney section shall 

be flush with the inside of the masonry chimney flue, and sealed 

with a non-water soluble refractory cement.  Use this cement to 

also seal to the brick masonry penetration.

Method  C.  6”  (152.4  mm)  Clearance  to  Combustible  Wall 

Member:  Starting  with  a  minimum  24  gage  (.024”  [.61  mm]) 

6”  (152.4  mm)  metal  chimney  connector,  and  a  minimum  24 

gage ventilated wall thimble which has two air channels of 1” 

(25.4 mm) each, construct a wall pass-through. There shall be a 

minimum 6” (152.4) mm separation area containing fiberglass 

insulation,  from  the  outer  surface  of  the  wall  thimble  to  wall 

combustibles.  Support the wall thimble, and cover its opening 

with a 24-gage minimum sheet metal support. Maintain the 6” 

(152.4 mm) space.  There should also be a support sized to fit 

and hold the metal chimney connector. See that the supports 

are fastened securely to wall surfaces on all sides.  Make sure 

fasteners used to secure the metal chimney connector do not 

penetrate chimney flue liner.  

Method D.  2” (50.8 mm) Clearance to Combustible Wall Member: 

Start with a solid-pak listed factory built chimney section at least 

12” (304 mm) long, with insulation of 1” (25.4 mm) or more, and 

an inside diameter of 8” (2 inches [51 mm] larger than the 6” 

[152.4 mm] chimney connector). Use this as a pass-through for a 

minimum 24-gauge single wall steel chimney connector. Keep 

solid-pak section concentric with and spaced 1” (25.4 mm) off 

the chimney connector by way of sheet metal support plates at 

both ends of chimney section.  Cover opening with and support 

chimney  section  on  both  sides  with  24  gage  minimum  sheet 

metal supports. See that the supports are fastened securely to 

wall  surfaces  on  all  sides.  Make  sure  fasteners  used  to  secure 

chimney flue line.

NOTES:

1. 

Connectors to a masonry chimney, excepting method B, shall extend in one continuous section through the 

wall pass-through system and the chimney wall, to but not past the inner flue liner face.

2. 

A chimney connector shall not pass through an attic or roof space, closet or similar concealed space, or a 

floor or ceiling.

Summary of Contents for US2941EB

Page 1: ...n Agency Certified to comply with 2020 particulate emissions standards Tested to ALT 125 ASTM E2515 ASTM E3053 and CSA B415 1 10 Certified to UL 1482 11 R2015 and Certified to ULC S627 00 Room Heater...

Page 2: ...Depth 11 3 8 x 24 3 4 289 mm x 629 mm Volume Cubic Feet 2 32 ft Door Opening Width x Height 10 x 11 3 8 854 mm x 289 mm Note Register your product on line at www usstove com Save your receipt with you...

Page 3: ...ob assembly 1 Remove the machine screw and the door knob 2 Place the knob on the outside of the cabinet door re install the machine screw and tighten Be careful not to strip out the threads in the han...

Page 4: ...ire department Do not connect to any air distribution duct or system A source of fresh air into the room or space heated shall be provided when required POSITIONING THE STOVE It is very important to p...

Page 5: ...The clearance between the flue pipe and a wall are valid only for vertical walls and for vertical flue pipe The chimney connector must not pass through an attic or roof space closet or similar concea...

Page 6: ...ing installed in is of tight construction or has negative pressure problems an outside source of air is needed Below is a list of possible indicators that a source of outside combustion air may be req...

Page 7: ...hose clamp over the tail piece and tighten SECURING APPLIANCE TO THE FLOOR Use the designated holes to secure the unit to the floor as shown 2 Slide the tail portion of the weather hood through the h...

Page 8: ...ough appliance and chimney connector joints An uncontrollable burn or excessive temperature indicates excessive draft To Appliance CHIMNEY Take into account the chimney s location to ensure it is not...

Page 9: ...re as recommended by the manufacturer The chimney must be the required height above the roof or other obstructions for safety and proper draft operation MASONRY CHIMNEY Ensure that a masonry chimney m...

Page 10: ...chimney connector and a minimum 24 gage ventilated wall thimble which has two air channels of 1 25 4 mm each construct a wall pass through There shall be a minimum 6 152 4 mm separation area containi...

Page 11: ...ns Under extreme conditions it may rot instead of drying This point cannot be over stressed the vast majority of the problems related to the operation of a wood stove is caused by the fact that the wo...

Page 12: ...s 6 Materials containing asbestos 7 Construction or demolition debris 8 Railroad ties or pressure treated wood 9 Manure or animal remains 10 Salt water driftwood or other previously salt water saturat...

Page 13: ...uired to properly burn coal or coal products Do not elevate the fire using grates or irons Build the fire directly on the firebrick FUELING INSTRUCTIONS This wood stove has been certified by the US EP...

Page 14: ...it is recommend to operate it with a wood load approximately equivalent to the height of fire bricks It is important to note that wood combustion consumes ambient oxygen in the room In the case of ne...

Page 15: ...ited this creosote makes an extremely high temper fire The chimney connector and chimney should be inspected at least once every two months during the heating season to determine if a creosote build u...

Page 16: ...posure It is recommended that you use both smoke and CO monitors in areas having the potential to generate CO GASKET CARE This unit s door uses a 1 diameter rope gasket It is recommended that you chan...

Page 17: ...6 891492 Blower Assembly B36 1 7 25598 Blower Mounting Box 1 8 29329 Smoke Curtain 1 9 610508 Right Side Casing 1 10 67969 Cabinet Door Assy 1 11 67444 Ash Pan Weldment 1 12 67859 Base Weldment 1 13...

Page 18: ...2 5 ft 8 40764 Cast Door 1 3 5 8 1 2 7 6 4 2 1 3 5 4 6 7 8 9 10 11 14 13 15 16 18 17 12 Key Part Description Qty 1 88336 Insulation Blanket 1 2 88335 Baffle Board 2 3 29437 Tube Retainer 1 4 29438 Ba...

Page 19: ...07 Date _____________________ Engineer Name ________________________________ License No ____________________________________ Company _____________________________________ Telephone No _______________...

Page 20: ...ice fiable et efficace de votre appareil de chauffage et vous permettre de commander correctement les pi ces de rechange Conservez ce manuel dans un endroit s r pour r f rence future Lors de l criture...

Page 21: ...____________________________ Service de 07 Date _____________________ Nom de l ing nieur ____________________________ N de licence _________________________________ Compagnie _________________________...

Page 22: ...neau d flecteur 2 3 29437 Retenue de tube 1 4 29438 C t d flecteur 1 5 27291 Dessus de doublure avant 1 6 29408 Retenue droite 1 7 893285 Brique r fractaire 3 8 27484 Support briques sup rieur 2 9 890...

Page 23: ...Base 1 13 22110 Bouclier Thermique 1 14 25550 Amortisseur De Tirage H pin 1 15 27469 Bras Amortisseur 1 16 610987 Ensemble De Bo te De Distribution D air 1 17 89687 Bouton De Thermostat Noir 1 18 6109...

Page 24: ...17 Pi ces De Rechange 1 2 3 4 6 7 9 10 11 12 13 14 15 16 17 19 20 21 22 23 18 24 25 26 27 28 5 8...

Page 25: ...S NEPERMETTEZPASAUCORDOND ALIMENTATION DE TOUCHER LES SURFACES CHAUDES GARDER LE CORDON D ALIMENTATION AU MOINS 12 po 30 5CM DES SURFACES DU PO LE OU DU TUYAU DANGER RISQUE D LECTROCUTION D BRANCHER L...

Page 26: ...r par p riodiquement pour fonctionner correctement Il est contraire la r glementation f d rale de faire fonctionner ce po le bois d une mani re non conforme aux instructions d utilisation de ce manue...

Page 27: ...DUITS D AIR Les conduits d air assembl s dans cette unit sont con us pour offrir un m lange pr cis d air secondaire et assurer une plus grande efficacit Tout dommage ou d t rioration de ces conduits p...

Page 28: ...usqu un lit de charbon de d marrage chargez l unit avec environ 24 lb de carburant pour la premi re charge de combustion lev e Fermez la porte imm diatement Apr s la premi re charge de combustion lev...

Page 29: ...Ce chauffage au bois a un taux de combustion minimum r gl la fabrication et qui ne peut tre modifi La modification de ce r glage ou une utilisation autre de ce chauffage au bois qui ne respecterait pa...

Page 30: ...is utilis tait trop humide ou avait s ch dans de mauvaises conditions Ces probl mes peuvent tre probl mes d allumage accumulation de cr osote causant des incendies de chemin e rendement nerg tique bas...

Page 31: ...ible Commencez avec une partie de chemin e Solid Pak fabriqu e en usine agr e d au moins 12 po 304 mm de diam tre int rieur avec une isolation de 1 po 25 4 mm ou plus et un raccord de chemin e de 8 po...

Page 32: ...d gagement appropri avec la structure tel que recommand par le fabriquant La chemin e doit avoir la hauteur requise au dessus du toit ou d autres obstructions pour des raisons de s curit et un bon tir...

Page 33: ...ent elle doit tre de type HT 2100 F Il est extr mement important qu elle soit install e conform ment aux sp cifications du fabriquant Si vous utilisez une chemin een ma onnerie il est important qu ell...

Page 34: ...ntr e d air le plus pr s possible du po le 3 Glissez les deux colliers de serrage sur le tuyau flexible en aluminium Glissez ensuite le tuyau flexible jusqu au tube d entr e d air du po le Serrez le c...

Page 35: ...ans lequel cette unit est install e est de construction tanche ou a des probl mes de pression n gative une source d air ext rieure est n cessaire Vous trouverez ci dessous une liste d indicateurs poss...

Page 36: ...ustibles moins de 4 pi 1 2 m de l avant de l appareil Le jeu entre le conduit de fum e et un mur est valable uniquement pour les parois verticales et conduit de fum e vertical Le connecteur de chemin...

Page 37: ...ION CONSULTER VOTRE SERVICE MUNICIPAL IMMEUBLE OU D INCENDIE PROPOS DE PERMIS RESTRICTIONS ET INSTALLATIONS EXIGENCES DANS VOTRE R GION UTILISATION D TECTEUR DE FUM E DANS LA PI CE O EST INSTALL VOTRE...

Page 38: ...oign e de porte 2 Placez le bouton l ext rieur de la porte de l armoire r installez la vis m taux et serrez Veillez ne pas retirer les fils de la poign e FONCTIONNEMENT DE LA POIGN E ET DE LA PORTE D...

Page 39: ...onstruction de 2020 de la US Environmental Protection Agency pour les appareils de chauffage au bois vendus apr s le 15 mai 2020 Dans des conditions de test sp cifiques il a t d montr que cet appareil...

Page 40: ...ENT LES PI CES DE R PARATION GARDEZ DANS UN ENDROIT S R POUR R F RENCE FUTURE Test selon ALT 125 ASTM E2515 ASTM E3053 et CSA B415 1 10 Certifi UL 1482 11 R2015 et Certifi ULC S627 00 Chauffage de pi...

Reviews: