background image

© 2021 United States Stove Company

3

INSTALLATION CHECKLIST

Your Wood Stove should be installed by a qualified installer only. An NFI qualified Installer can be found at 

www.

nficertified.org/public/find-an-nfi-pro/

CUSTOMER SERVICE

1-800-750-2723 ext 5050

Text to 423-301-5624

Email to: [email protected]

COMMISSIONING CHECKLIST

This checklist is to be completed in full by the qualified person who installs this unit. Keep this page for future reference.
Failure to install and commission according to the manufacturer’s instructions and complete this checklist will 

invalidate the warranty.

Please Print

Customer Name:

Telephone Number:

Address:
Model:
Serial Number:
Installation Company Name:

Phone Number:

Installation Technician’s Name:

License Number:

DESCRIPTION OF WORK

Location of installed appliance:  __________________________________________________________________________________

Venting System: New Venting System        Yes        No    If yes, Brand ____________________________________________

If no, Date of inspection of existing venting system: _______________________________________________________________

COMMISSIONING

Confirm Hearth Pad Installation as per Installation Instructions ...................................................................................................
Confirm proper placement of internal parts ..........................................................................................................................................
Check soundness of door gasket and door seals .................................................................................................................................
Confirm clearances to combustibles as per installation instructions in this manual ..............................................................
Check the operations of the air controls .................................................................................................................................................
Confirm the venting system is secure and sealed ...............................................................................................................................
Confirm the stove starts and operates properly ..................................................................................................................................
Check to ensure a CO alarm is installed as per local building codes and is functional ............................................................
Explain the safe operation, proper fuel usage, cleaning, and routine maintenance requirements .......................................

Declaration of Completion: As the qualified person responsible for the work described above, I confirm that the appliance 

as associated work has been installed as per manufacturer’s instructions and following any applicable building and 

installation codes.

Signed: ______________________________________ Print Name: __________________________________Date: ______________

Home Owner: RETAIN THIS INFORMATION FOR FUTURE REFERENCE

Summary of Contents for KP60-XH

Page 1: ...ng or fire officials about permits restrictions and installation requirements in your area NEVER OPERATE THIS PRODUCT WHILE UNATTENDED CAUTION Please read this entire manual before you install or use...

Page 2: ...2020 U S Environmental Protection Agency s crib wood emission limits for wood heaters sold after May 15 2020 Under specific EPA test conditions burning Douglas Fir dimensional lumber this heater has b...

Page 3: ...and_____________________________________________ If no Date of inspection of existing venting system ________________________________________________________________ COMMISSIONING Confirm Hearth Pad I...

Page 4: ...MUST BE PLUGGED INTO A 110 120V 60 HZ GROUNDED ELECTRICAL OUTLET DO NOT USE AN ADAPTER PLUG OR SEVER THE GROUNDING PLUG DO NOT ROUTE THE ELECTRICAL CORD UNDERNEATH IN FRONT OF OR OVER THE HEATER DO N...

Page 5: ...or non combustible surface should be large enough to cover at least the area under the product and 6 153 mm beyond the front and beyond each side of the fuel loading and ash removal openings Floor pr...

Page 6: ...ate paint or protective coating to ensure grounding Vent must be 3 or 4 inch PL Vent and must extend a minimum or 36 914 mm above the roof line of the mobile home and must be installed using a certifi...

Page 7: ...pellet vent pipe is not furnished with the unit and must be purchased separately PELLET VENT INSTALLATION The installation must include a clean out tee to enable collection of fly ash and to permit pe...

Page 8: ...d void your warranty HORIZONTAL EXHAUST VENT INSTALLATION 1 Locate your pellet stove in a location which meets the requirements of this manual but in an area where it does not interfere with the house...

Page 9: ...o get above the snowdrift line This same installation can be used if your heater is below ground level by simply adding the clean out section and vertical pipe inside until ground level is reached Wit...

Page 10: ...ll with too much fuel and the fire will smother out To much air will result in a flame that is overactive or aggressive The flame in this situation is typically very blue at the bottom and resembles a...

Page 11: ...ordance to the heat range setting However this speed can be manually operated by pressing the Draft Fan arrows up or down Draft Fan when pressed the display will show Df A which is automatic Press the...

Page 12: ...the stove cycle between the preselected desired heat range setting 1 to 5 and the minimum heat range setting of 1 The T Stat will not turn the stove on and off When the desired room temperature has be...

Page 13: ...reduced performance Store your pellets in a dry place DO NOT store the fuel within the installation clearances of the unit or within the space required for refuelling and ash removal Doing so could re...

Page 14: ...ROOM THE DOOR MUST BE CLOSED AND SEALED DURING OPERATION If the door is opened while the stove is in operation it must be closed within 30 seconds or the stove will shut down If the stove shuts down...

Page 15: ...NTERIOR CHAMBERS Burn Pot Periodically remove and clean the burn pot and the area inside the burn pot housing In particular it is advisable to clean out the holes in the burn pot to remove any build u...

Page 16: ...f chimney in use A qualified chimney sweep can perform this service It is also recommended that before each heating season the entire system be professionally inspected cleaned and if necessary repair...

Page 17: ...f glass from the door frame 4 Replace the glass and gasket making sure the gasket runs the full perimeter of the glass edge 5 Re install the retainer and eight nuts and rope gasket using high temperat...

Page 18: ...ets Check that all outside connections are clear of any obstructions Check the exhaust system clean as needed Checkthatthepressureswitchconnectiontothefireboxisfreeofashorclearofobstructions Auger sys...

Page 19: ...he stove is in the Shut Down state waiting for the off button or for a 15 minute period after the stove was turned off or for the stove to cool down or for the door to be closed Flashing dash in Heat...

Page 20: ...t W Adhesive 7 28 ft 2 893159 Clear Glass 1 3 88324 1 Rope Gasket 5 17 ft 4 80780 IR Remote 1 5 69762 Burnpot Assembly 1 6 80491 Microswitch 1 7 80518 Keypad Assembly 1 8 80549 Pressure Switch 1 9 883...

Page 21: ...ll help to ensure the correct items are ordered Before contacting customer service write down the model number and the serial number of this unit That information can be found on the certification lab...

Page 22: ..._____ Engineer Name _____________________________________ License No _________________________________________ Company ___________________________________________ Telephone No ________________________...

Page 23: ...2021 United States Stove Company 23 NOTES...

Page 24: ...24 2021 United States Stove Company NOTES...

Page 25: ...2021 United States Stove Company 25 NOTES...

Page 26: ..._____________________ Service de 07 Date ______________________ Nom de l ing nieur _________________________________ N de licence ______________________________________ Compagnie _____________________...

Page 27: ...reil Lors de la commande de pi ces de rechange les informations contenues dans ce manuel vous aideront vous assurer que les bons articles sont command s Avant de contacter le service client notez le n...

Page 28: ...sif 7 28 pi 2 893159 Verre propre 1 3 88324 Joint de corde 1 po 5 17 pi 4 80780 T l commande IR 1 5 69762 Assemblage du pot de combustion 1 6 80491 Micro interrupteur 1 7 80518 Assemblage du clavier 1...

Page 29: ...t deux fois par seconde Cela indique que le po le fonctionne normalement et qu une condition de temp rature excessive existe provoquant l arr t du combustible Indicateur de r glage du niveau de chaleu...

Page 30: ...st me vis sans fin est bloqu ou il y a une vo te de combustible dans la tr mie qui emp che le combustible de s couler dans le syst me d approvisionnement vis sans fin PROBL ME CAUSE L allumeur automat...

Page 31: ...propri taire sont sp cifiques votre appareil Lors de la commande de pi ces de rechange les informations contenues dans ce manuel vous aideront vous assurer que les bons articles sont command s Avant d...

Page 32: ...verre N UTILISEZ PAS de nettoyants abrasifs N effectuez PAS le nettoyage lorsque la vitre est CHAUDE N essayez pas de faire fonctionner l appareil avec du verre bris Le verre de remplacement peut tre...

Page 33: ...p cialement con ue pour le type de chemin e utilis Un ramoneur qualifi peut fournir ce service Il est galement conseill d inspecter de nettoyer et si n cessaire de r parer la totalit du syst me avant...

Page 34: ...ent le pot de combustion et la zone l int rieur du bo tier du pot de combustion En particulier il est conseill de nettoyer les trous du pot de combustion pour liminer toute accumulation qui pourrait e...

Page 35: ...S CIRCONSTANCES ET UN PROBL ME DE S CURIT PEUT PROVOQUER DES TINCELLES OU DES FUM ES ENTRANT DANS LA PI CE LA PORTE DOIT TRE FERM E ET SCELL E PENDANT LE FONCTIONNEMENT Si la porte est ouverte pendant...

Page 36: ...sont mouill s r duiront les performances Rangez vos pellets dans un endroit sec NE stockez PAS le carburant dans les d gagements d installation de l appareil ou dans l espace requis pour faire le ple...

Page 37: ...faire en sorte que le po le se programme entre le r glage pr s lectionn de la plage de chaleur d sir e 1 5 et le r glage de la plage de chaleur minimale de 1 Le T Stat n allumera ni ne teindra le po l...

Page 38: ...itesse conform ment au r glage du niveau de chaleur Cependant cette vitesse peut tre r gl e manuellement en appuyant sur les fl ches haut et bas du ventilateur de tirage Draft Fan Lorsque le bouton Dr...

Page 39: ...ant une dur e suffisante le pot de combustion se remplira avec trop de combustible et le feu s touffera Trop d air provoquera une flamme hyperactive ou agressive La flamme dans cette situation est g n...

Page 40: ...L installation travers le mur est l installation la moins ch re et la plus simple Ne jamais mettre fin l vent de fin sous un pont dans une alc ve sous une fen tre ou entre deux fen tres 90 Elbow Cap d...

Page 41: ...ure 4 Localisez le centre du tuyau d chappement de votre unit Ce point devrait ensuite tre tendu la paroi int rieure de votre maison Une fois que vous avez localis le point central sur la paroi int ri...

Page 42: ...coude ou t r duit le potentiel de tirage de 30 50 Tous les joints du syst me de ventilation doivent tre fix s par au moins 3 vis et tous les joints doivent tre scell s avec du mastic silicone Hi Temp...

Page 43: ...obligatoire pour l installation d une maison mobile Consultez la section Alimentation en air ext rieur et votre revendeur pour l achat V rifiez aupr s de vos responsables locaux du b timent car d aut...

Page 44: ...des cendres La protection du plancher doit s tendre sous et 2 51 mm de chaque c t du t de chemin e pour une installation verticale int rieure Les installations canadiennes n cessitent un minimum de 1...

Page 45: ...UPEZ PAS LA FICHE DE TERRE N ACHEMINEZ PAS LE CORDON LECTRIQUE SOUS DEVANT OU SUR LE PO LE NE FAITES PAS COURIR LE CORDON LECTRIQUE DANS LES ZONES DE PASSAGE ET NE LE COINCEZ PAS SOUS LES MEUBLES ATTE...

Page 46: ...n date d inspection du syst me de ventilation existant ___________________________________________________________________ MISE EN SERVICE Confirmer l installation du tapis de foyer conform ment aux i...

Page 47: ...e tarif r glage le plus bas 1 5 lbs hr Taille de Pellet peut effectuer le taux r el d alimentation en carburant et de br ler fois Taux d alimentation en carburant peut varier par autant que 20 Utilise...

Page 48: ...ictions et les exigences d installation dans votre r gion NE JAMAIS UTILISER CE PRODUIT SANS SURVEILLANCE MISE EN GARDE Veuillez lire l int gralit de ce manuel avant d installer ou d utiliser votre no...

Reviews: