© 2022 United States Stove Company
3
INSTALLATION CHECKLIST
Your Wood Stove should be installed by a qualified installer only. An NFI qualified Installer can be found at
www.nficertified.org/public/find-an-nfi-pro/
CUSTOMER SERVICE
1-800-750-2723 ext 5050
Text to 423-301-5624
Email to: [email protected]
COMMISSIONING CHECKLIST
This checklist is to be completed in full by the qualified person who installs this unit. Keep this page for
future reference.
Failure to install and commission according to the manufacturer’s instructions and complete this checklist
will invalidate the warranty.
Please Print
Customer Name:
Telephone Number:
Address:
Model:
Serial Number:
Installation Company Name:
Phone Number:
Installation Technician’s Name:
License Number:
DESCRIPTION OF WORK
Location of installed appliance: _________________________________________________________________________
Venting System: New Venting System
Yes
No If yes, Brand
__________________________________
If no, Date of inspection of existing venting system:
______________________________________________________
COMMISSIONING
Confirm Hearth Pad Installation as per Installation Instructions
..............................................................................................
Confirm proper placement of internal parts
...........................................................................................................................................
Check soundness of door gasket and door seals .................................................................................................................................
Confirm clearances to combustibles as per installation instructions in this manual
.................................................
Check the operations of the air controls ....................................................................................................................................................
Confirm the venting system is secure and sealed
...............................................................................................................................
Confirm the stove starts and operates properly
....................................................................................................................................
Check to ensure a CO alarm is installed as per local building codes and is functional .............................................
Explain the safe operation, proper fuel usage, cleaning, and routine maintenance requirements
.................
Declaration of Completion: As the qualified person responsible for the work described above, I confirm that
the appliance as associated work has been installed as per manufacturer’s instructions and following any
applicable building and installation codes.
Signed:
___________________________________Print Name: ______________________________ Date: _____________
Home Owner: RETAIN THIS INFORMATION FOR FUTURE REFERENCE
Summary of Contents for KP5522
Page 11: ...Project 22 753 Model KP5522 Page 10 Appliance Front Appliance Left...
Page 12: ...Project 22 753 Model KP5522 Page 11 Appliance Right Appliance Rear...
Page 14: ...Project 22 753 Model KP5522 Page 13 Pellet Fuel Analysis...
Page 17: ...Project 22 753 Model KP5522 Page 16 Sealed Unit...
Page 54: ......
Page 55: ......
Page 56: ......
Page 58: ...Project 22 751 Model Charnwood Skye E700 Page 16 Tunnel Schematic...
Page 102: ......
Page 103: ......
Page 104: ......
Page 129: ...2022 United States Stove Company 25 NOTES...
Page 177: ...2022 United States Stove Company 25 NOTES...
Page 272: ...24 2022 United States Stove Company NOTES...
Page 308: ......
Page 309: ......
Page 311: ......
Page 312: ......
Page 318: ......
Page 319: ......