Model: 7700
United States Stove Company
227 Industrial Park Rd
PO Box 151
South Pittsburg, TN 37380
OMNI-Test Laboratories, Inc.
Certification Test Report dated July 2016
Table 1.6 - Dilution Tunnel Gas Measurements and Sampling Data Summary
Run
Length of Test
(min)
Average Dilution Tunnel Gas Measurements
Velocity
(ft/sec)
Flow Rate
(dscf/min)
Temperature
(°F)
1
636
13.58
264.2
89.9
2
184
13.02
232.5
145.8
3
287
13.39
250.6
111.8
4
429
13.39
262.0
94.8
Table 1.7
– Pretest Configurations
Run
Output Target
Air Controls
Time
(min)
1
0-34% of max
Varied manually to
maintain target output
149
2
35-52% of max
Varied manually to
maintain target output
125
3
53-76% of max
Varied manually to
maintain target output
178
4
Max capacity
Varied manually to
maintain target output
154
47
Summary of Contents for 7700
Page 10: ...10...
Page 38: ...28 NOTES 38...
Page 39: ...29 NOTES 39...
Page 58: ...Client QC inc Date March 6 2011 Project No Page 8 of 13 IV A 1 DILUTION TUNNEL...
Page 103: ......
Page 104: ...Run 1 Cat 1...
Page 105: ...run 2 Cat 4...
Page 106: ...Run 3 cat 3...
Page 107: ...Run 4 Cat 2...
Page 108: ......
Page 135: ......
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......
Page 147: ......
Page 148: ......
Page 149: ......
Page 150: ......
Page 151: ......
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ......
Page 158: ......
Page 159: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......
Page 164: ......
Page 165: ......
Page 166: ......
Page 167: ......
Page 169: ......
Page 170: ......
Page 172: ......
Page 173: ......
Page 174: ......
Page 175: ......