background image

035-20499-001 Rev. B (1004)

Unitary Products Group

5

If a matching cooling coil is used, it may be placed directly on the fur-
nace outlet and sealed to prevent leakage. Follow the coil instructions
for installing the supply plenum. On all installations without a coil, a
removable access panel is recommended in the outlet duct such that
smoke or reflected light would be observable inside the casing to indi-
cate the presence of leaks in the heat exchanger. This access cover
shall be attached in such a manner as to prevent leaks.

RESIDENTIAL AND NON HUD MODULAR HOME 

RETURN PLENUM CONNECTION

Return air may enter the furnace through the side(s) or bottom depend-
ing on the type of application. Return air may not be connected into the
rear panel of the unit. In order to achieve the airflow indicated, it is rec-
ommended those applications over 1800 CFM (57 m³/min) use return
air from two sides, one side and the bottom or bottom only. For single
return application, see data and notes on blower performance data
tables in this manual.

BOTTOM RETURN AND ATTIC INSTALLATIONS

Bottom return applications normally pull return air through a base plat-
form or return air plenum. Be sure the return platform structure or return
air plenum is suitable to support the weight of the furnace.

The furnace base is equipped with a rectangular blockoff panel that can
be removed by performing the following steps:

1.

Lay the furnace on its back.

2.

Remove the toe plate. See Figure 2.

3.

Slide the blockoff panel out and then replace the toe plate.

4.

Bend the 3/4” flanges that will be used to attach the return air ple-
num using the scribe marks in the furnace base. Refer to Figure 1
“Bottom Image Return End”.

5.

Be sure to seal the furnace to plenum connections to prevent air
leakage. Refer to Figure 1 for unit and plenum dimensions.

Attic installations must meet all minimum clearances to combustibles
and have floor support with required service accessibility.

The supply air temperature MUST NEVER  exceed the Maximum
Supply Air Temperature
, specified on the nameplate.
Operating the furnace above the maximum supply air temperature
will cause the heat exchanger to overheat, causing premature heat
exchanger failure. Improper duct sizing, dirty air filters, incorrect
manifold pressure, incorrect gas orifice and/or a faulty limit switch
can cause the furnace to operate above the maximum supply air
temperature. Refer to sections II and III for additional information on
correcting the problem.

 FIGURE 1:  

Dimensions

 

30-7/8

21-1/2

13-7/8

7

11

7/8

23-3/4

7/8

30-1/8

26-1/2

24-5/8

A

40

26-1/2

25-3/8

28-3/8

21-1/2

11

8

1-1/2” GAS
PIPE ENTRY

7/8” JUNCTION
BOX HOLE

T-STAT WIRING
7/8” K.O.

CONDENSATE
DRAIN 7/8” K.O.

OPTIONAL RETURN AIR
CUT-OUT (either side)
FOR USE WITH
EXTERNAL FILTER
FRAME

LEFT SIDE

FRONT

RIGHT SIDE

26-3/4

1-3/8

1-1/4

C

24-3/8

20

5/8

5/8

B

26-1/2

1-3/4

D

BOTTOM IMAGE

RETURN END

TOP IMAGE

SUPPLY END

1-1/2” GAS
PIPE ENTRY

7/8” JUNCTION
BOX HOLE

T-STAT WIRING
7/8” K.O.

CONDENSATE
DRAIN 7/8” K.O.

BTUH (kW)

Input/Output

CFM

m

3

/min)

Cabinet

Size

Cabinet Dimension

Air Intake

A (in.)

A (cm)

B (in.)

B (cm)

C (in.)

C (cm)

D (in.)

D (cm)

40/38 (11.7/10.8)

1200 (33.98)

A

14-1/2

36.8

13-1/4

33.7

12-1/8

30.8

6-1/4

15.9

60/56 (17.8/16.4)

1200 (33.98)

B

17-1/2

44.4

16-1/4

41.3

15-1/8

38.4

8-1/2

21.6

80/75 (12.4/21.96)

1200 (33.98)

B

17-1/2

44.4

16-1/4

41.3

15-1/8

38.4

8-1/2

21.6

80/75 (23.42/21.96)

1600 (45.31)

C

21

53.3

19-3/4

50.2

18-1/2

47.0

8-7/8

22.5

100/93 (29.28/27.25)

2000 (56.63)

C

21

53.3

19-3/4

50.2

18-1/2

47.0

8-7/8

22.5

120/112 (35.14/32.80)

2000 (56.63)

D

24-1/2

62.2

23-1/4

59.4

21-7/8

55.6

10-5/8

27.0

Summary of Contents for FC9V

Page 1: ...des TABLE OF CONTENTS SAFETY 1 DUCTWORK 3 FILTERS 6 GAS PIPING 6 ELECTRICAL POWER 8 COMBUSTION AIR AND VENT SYSTEM 9 CONDENSATE PIPING 16 SAFETY CONTROLS 16 START UP AND ADJUSTMENTS 17 WIRING DIAGRAM...

Page 2: ...tional vehicles Failure to carefully read and follow all instructions in this manual can result in furnace malfunction death personal injury and or property damage Furnaces for installation on combust...

Page 3: ...is required for passage to the front when servicing or for inspection or replacement of flue vent connections In all cases accessibility clearances shall take precedence over clear ances for combustib...

Page 4: ...ABLES 2 AND 3 are to be used as a guide only to help the installer determine if the duct sizes are large enough to obtain the proper air flow CFM through the furnace TABLES 2 and 3 ARE NOT to be used...

Page 5: ...rn End 5 Be sure to seal the furnace to plenum connections to prevent air leakage Refer to Figure 1 for unit and plenum dimensions Attic installations must meet all minimum clearances to combustibles...

Page 6: ...28 27 25 2000 57 C 16 x 25 41 x 64 20 x 25 51 x 64 120 112 2000 35 14 32 80 2000 57 D 2 16 x 25 2 41 x 64 22 x 25 56 x 64 All installations must have a filter installed Toe Plate Removable Rectangula...

Page 7: ...4 National Fuel Gas Code or in Canada CAN CGA B149 1 00 Natural Gas and Propane Installation Code HIGH ALTITUDE PRESSURE SWITCH CONVERSION For installation in locations where the altitude is less than...

Page 8: ...furnace s control system requires correct polarity of the power supply and a proper ground connection Refer to Figure 6 IMPORTANT The power connection leads and wiring box may be relo cated to the le...

Page 9: ...hese instructions IMPORTANT The VENT SYSTEM must be installed as specified in these instructions for Residential and Non HUD Modular Homes The sealed combustion air vent system is the only configurati...

Page 10: ...is as follows 1 Cut piping to the proper length beginning at the furnace 2 Deburr the piping inside and outside 3 Chamfer bevel the outer edges of the piping 4 Dry fit the vent piping assembly from th...

Page 11: ...1 US Installation2 A Clearance above grade veranda porch deck or balcony 12 inches 30 cm 12 inches 30 cm B Clearance to window or door that may be opened 6 inches 15 cm for applications 10 000 Btuh 3k...

Page 12: ...bustion air systems must be installed so the vent and the combustion air pipes terminate in the same atmospheric zone Refer to Figures 13 or 14 VENTING MULTIPLE UNITS Multiple units can be installed i...

Page 13: ...STION AIR Combustion air is supplied through a PVC or ABS pipe that is connected to the PVC coupling attached to the burner box and is terminated in a ventilated attic or crawl space The combustion ai...

Page 14: ...ion smaller than 0 25 6 4 mm 3 A manually operated damper or manually adjustable louvers are not permitted for use 4 A automatically operated damper or automatically adjustable lou vers shall be inter...

Page 15: ...w usage Follow all notes procedures and required materials in the SEALED COMBUS TION AIR SUPPLY section in these instructions when installing the combustion air pipe from the unit and into a ventilate...

Page 16: ...densate sump pump must be approved for use with acidic condensate CONDENSATE DRAIN TRAP AND DRAIN FREEZE PROTECTION Special precautions MUST be made if installing furnace in an area which may drop bel...

Page 17: ...bing 2 pieces of 4 10 cm length x 1 8 0 3 cm diameter tubing 1 5 16 0 8 cm tee 1 5 16 0 8 cm x 1 8 0 3 cm reducing coupling 1 1 8 0 3 cm adapter 1 Dwyer Manometer These items are required in order to...

Page 18: ...ivided by the time it took to measure 2 cubic ft 0 0566 m3 of gas from the gas meter For Propane LP Gas multiply the Heat content of the gas MJ m3 or Default 93 14 times 0 00283 m3 of gas measured at...

Page 19: ...as shown in Figure 24 The procedure below is used to adjust either the high fire manifold pressure or the low fire manifold pressure IMPORTANT The cap for the pressure regulator must be removed entir...

Page 20: ...Heating and Cooling Airflow The heating and the cooling airflows are preset at the factory The heat ing airflow is set to the maximum CFM The cooling airflow is set to pro vide 90 percent of the maxi...

Page 21: ...all for cooling the motor will ramp up to 63 of full capacity and will stay there for 90 seconds then will ramp up to full capacity At the end of the cooling cycle the motor will ramp down to 63 of fu...

Page 22: ...4 1880 1250 53 2 35 4 A C 1560 1010 44 2 28 6 1620 1030 45 9 29 2 C B 1470 940 41 6 26 6 1500 960 42 5 27 2 B C 1370 890 38 8 25 2 1410 880 39 9 24 9 D B 1460 930 41 3 26 3 1490 920 42 2 26 1 C A 125...

Page 23: ...the airflow table i e 0 20 w c 50 Pa 0 60 w c 150 Pa etc the system airflow cor responds to the intersection of the ESP column and Model Blower Speed row TABLE 16 Filter Performance Pressure Drop Inc...

Page 24: ...ed in U S A 035 20499 001 Rev B 1004 Copyright by York International Corp 2004 All rights reserved Supersedes 035 20499 001 Rev A 0904 Unitary 5005 Norman Product York OK Group Drive 73069 SECTION X W...

Reviews: