TABLE 9: MINIMUM CLEARANCES - CED060
LOCATION
CLEARANCE
LOCATION
CLEARANCE
Side w/ RTN Air Opening
24”
Side Opposite Piping Conn.
12”
Side w/ SPLY Air Opening
24”
1
Side w/ Access for PWR & CTRL Wiring
-
2
Side w/ Piping Conn.
36”
3
Bottom
-
4
1.
Overall dimension of the unit will vary if an electric heater or a supply air plenum is used
2.
Although no clearance is required for service and operation some clearance may be required for routing the power and control wir-
ing.
3.
This dimension is required for removal of the coil. Only 26” is required for normal servicing.
4.
Allow enough clearance to trap the auxiliary drain line.
TABLE 10: MINIMUM CLEARANCES - CED090 & 120
LOCATION
CLEARANCE
LOCATION
CLEARANCE
Side w/ RTN Air Opening
24”
Side Opposite Piping Conn.
12”
Side w/ SPLY Air Opening
24”
1
Side w/ Access for PWR & CTRL Wiring
-
2
Side w/ Piping Conn.
52”
3
Bottom
-
4
1.
Overall dimension of the unit will vary if an electric heater or a supply air plenum is used
2.
Although no clearance is required for service and operation some clearance may be required for routing the power and control
wiring.
3.
This dimension is required for removal of the coil. Only 26” is required for normal servicing.
4.
Allow enough clearance to trap the auxiliary drain line.
TABLE 11: MINIMUM CLEARANCES - CED180
LOCATION
CLEARANCE
LOCATION
CLEARANCE
Side w/ RTN Air Opening
24”
Side Opposite Piping Conn.
26
1
”
Side w/ SPLY Air Opening
24”
2
Bottom
-
3
Side w/ Piping Conn.
61”
4
1.
If the coil has to be removed, this dimension is required to loosen screws that secure the coil to the unit frame. This dimension will
also be required for blower motor access if the piping connections are made on the opposite side of the unit.
2.
Overall dimension of the unit will vary if an electric heater or a supply air plenum is used
3.
Allow enough clearance to trap the auxiliary drain line
4.
This dimension is required for removal of the coil. Only 26” is required for normal servicing.