CONDENSATE DRAIN

The condensate trap must be filled with water before putting the furnace
into operation. Perform the following procedures only after the conden-
sate trap has been properly piped to a drain connection using the pro-
cedure in this instruction. 

The recommended procedure is as follows:

1.

Disconnect the condensate drain hose from the induced draft
blower discharge.

2.

Elevate this hose and fill with water using a funnel.

3.

Replace the condensate drain hose and clamps.

IMPORTANT: 

If this procedure is not followed, the unit may not properly

drain on initial start up.

CONDENSATE DRAIN TERMINATION

DO NOT terminate condensate drain in a chimney, or where the drain
line may freeze. The line must terminate at an inside drain to prevent
freezing of the condensate and possible property damage.

DO NOT trap the drain line at any other location than at the condensate
drain trap supplied with the furnace.

A condensate sump pump MUST be used if required by local codes, or
if no indoor floor drain is available. The condensate sump pump must
be approved for use with acidic condensate.

CONDENSATE DRAIN TRAP AND DRAIN FREEZE 

PROTECTION

Special precautions MUST be made if installing furnace in an area
which may drop below freezing. This can cause improper operation or
damage to the equipment. If the furnace is installed in an area that has
the potential of freezing, the drain line and the drain trap must be pro-
tected. Use a 3 to 6 watt per foot at 115 vac, 40º F (4.4° C) self-regulat-
ing, shielded and waterproof heat tape. Wrap the drain trap and the
drain line with the heat tape and secure with ties. Follow the heat tape
manufacturer's recommendations.

SECTION VIII: SAFETY CONTROLS

CONTROL CIRCUIT FUSE

A 3-amp fuse is provided on the control circuit board to protect the 24-
volt transformer from overload caused by control circuit wiring errors.
This is an ATO 3, automotive type fuse and is located on the control
board.

BLOWER DOOR SAFETY SWITCH

This unit is equipped with an electrical interlock switch mounted in the
blower compartment. This switch interrupts all power at the unit when
the panel covering the blower compartment is removed.

Electrical supply to this unit is dependent upon the panel that covers the
blower compartment being in place and properly positioned.

ROLLOUT SWITCH CONTROLS

These controls are mounted on the burner box assembly. If the temper-
ature in the burner box exceeds its set point, the ignition control and the
gas valve are de-energized. The operation of this control indicates a
malfunction in the combustion air blower, heat exchanger or a blocked
vent pipe connection. Corrective action is required. These are manual
reset controls that must be reset before operation can continue.

PRESSURE SWITCHES

This furnace is supplied with two pressure switches which monitor the
flow through the combustion air/vent piping system. These switches de-
energize the ignition control module and the gas valve if any of the fol-
lowing conditions are present. Refer to Figure 20 for tubing connec-
tions.

1.

Blockage of combustion air piping or terminal.

2.

Blockage of vent piping or terminal.

3.

Failure of combustion air blower motor.

4.

Blockage of condensate drain piping.

LIMIT CONTROLS

There is high temperature limit control located on the furnace vestibule
panel near the gas valve. This is an automatic reset control that pro-
vides over-temperature protection due to reduced airflow. This may be
caused by 

1.

dirty filter,

2.

if the indoor fan motor should fail, or

3.

Too many supply or return registers closed or blocked off.

The control module will lockout if the limit trips 5 consecutive times
within a single call for heat. Control will reset and try ignition again after
1 hour.

SECTION IX: START-UP AND 

ADJUSTMENTS

The initial start-up of the furnace requires the following additional
procedures:

IMPORTANT: 

All electrical connections made in the field and in the fac-

tory should be checked for proper tightness.

When the gas supply is initially connected to the furnace, the gas piping
may be full of air. In order to purge this air, it is recommended that the
ground union be loosened until the odor of gas is detected. When gas is
detected, immediately retighten the union and check for leaks. Allow
five minutes for any gas to dissipate before continuing with the start-up
procedure. Be sure proper ventilation is available to dilute and carry
away any vented gas.

Main power to the unit must still be interrupted at the main power
disconnect switch before any service or repair work is to be done to
the unit. Do not rely upon the interlock switch as a main power dis-
connect.
Blower and burner must never be operated without the blower
panel in place.

 FIGURE 20:  

Pressure Switch Tube Routing

Perform the following procedures only after the condensate trap
has been properly piped to a drain connection using the procedure
in this instruction.

Summary of Contents for AHV9 UP

Page 1: ...electrical and mechanical codes LIST OF SECTIONS SAFETY 1 DUCTWORK 4 FILTERS 6 GAS PIPING 7 ELECTRICAL POWER 8 COMBUSTION AIR AND VENT SYSTEM 12 CONDENSATE PIPING 18 SAFETY CONTROLS 19 START UP AND AD...

Page 2: ...ible materials as listed under Clearances to Combustibles in Table 1 Provide clearances for servicing ensuring that service access is allowed for both the burners and blower These models ARE NOT CSA l...

Page 3: ...or and the furnace must be located or protected to avoid physical damage by vehicles The furnace area must not be used as a broom closet or for any other storage purposes as a fire hazard may be creat...

Page 4: ...NOTE When attaching duct flange do not shoot the screw down into the casing Use the formed flange intended for duct flange attachment The duct system is a very important part of the installation If th...

Page 5: ...e presence of leaks in the heat exchanger This access cover shall be attached in such a manner as to prevent leaks TABLE 2 Minimum Duct Sizing For Proper Airflow Input Cabinet Airflow Return1 Rectangu...

Page 6: ...provided with that accessory for proper hole cut size SECTION III FILTERS FILTER INSTALLATION All applications require the use of a filter Filters must be installed external to the furnace cabinet DO...

Page 7: ...igure 1 dimensions The inlet to the gas valve lines up directly with the opening in the left side of the furnace casing To line up with the opening in the right side of the casing two street ells shou...

Page 8: ...5 1 4 1 3 39 1 0 37 0 34 0 31 1100 1 3 1 2 1 1 41 0 0 34 0 31 0 28 2500 LP 4 1 3 8 3 5 93 2 LP 1 03 0 95 0 87 PROPANE AND HIGH ALTITUDE CONVERSION KITS It is very important to choose the correct kit...

Page 9: ...o the terminal board on the ignition module as shown in Figures 5 and 6 Electronic thermostats may require the common wire to be connected as shown in Figures 5 and 6 Apply strain relief to thermostat...

Page 10: ...ight O Reversing Valve Energized in Cool TWO STAGE AIR CONDITIONING Comfort Alert Interface HUM Dehumidification Open on Humidity Rise C 24 Volt Common C 24 Volt Common R 24 Volt Hot W2 Second Stage H...

Page 11: ...W2 Delay on furnace to OFF HM Humidistat BSG Bonnet Sensor Bonnet Sensor Optional BS Bonnet Sensor AUX Auxiliary Heat E W1 First Stage Auxiliary Heat E W1 First Stage Auxiliary Heat W Auxiliary Heat Y...

Page 12: ...length listed in Table 8 is for the vent pip ing and the air intake piping separately For example if the table allows 65 equivalent feet for a particular model then the vent can have 65 equivalent fe...

Page 13: ...piping apply cement primer and the cement per the manufactures instructions Primer and cement must conform to ASTM D2564 for PVC or ASTM D2235 for ABS piping 7 All joints must provide a permanent air...

Page 14: ...ns 9 inches 23 cm for models 50 000 BTUH 15 kW 12 inches 30 cm for models 50 000 BTUH 15 kW C Clearance to permanently closed window 12 inches 30 cm 12 inches 30 cm D Vertical clearance to ventilated...

Page 15: ...systems must be installed so the vent and the combustion air pipes terminate in the same atmospheric zone Refer to Figures 11 or 12 VENTING MULTIPLE UNITS Multiple units can be installed in a space or...

Page 16: ...vent Care should be taken to locate side vented systems where trees or shrubs will not block or restrict supply air from entering the terminal Also the terminal assembly should be located as far as p...

Page 17: ...LE VENT GAS VENT SOFFIT VENT VENTILATED ATTIC TOP ABOVE INSULATION OPTIONAL INLET a OUTLET AIR a VENTILATED CRAWL SPACE GAS WATER HEATER VENTILATED ATTIC TOP ABOVE INSULATION GAS VENT GABLE VENT SOFFI...

Page 18: ...Air The ventilated attic space or a crawl space from which the combustion air is taken must comply with the requirements specified in AIR SOURCE FROM OUTDOORS in this instruction or in Section 5 3 Air...

Page 19: ...e controls are mounted on the burner box assembly If the temper ature in the burner box exceeds its set point the ignition control and the gas valve are de energized The operation of this control indi...

Page 20: ...ll start and come up to speed Shortly after inducer start up the hot surface igniter will glow for about 17 seconds b After this warm up the ignition module will energize open the main gas valve c Aft...

Page 21: ...3600 then divided by the time it took to measure 0 10 m3 of gas from the gas meter For Propane LP Gas multiply the Heat content of the gas MJ m3 or Default 93 15 times 0 10 m3 of gas measured at the...

Page 22: ...shown in Figure 21 The procedure below is used to adjust either the high fire manifold pressure or the low fire manifold pressure IMPORTANT The cap for the pressure regulator must be removed entirely...

Page 23: ...blown into the heated space The fan off timing may be adjusted by positioning the jumper on two of the four pins as shown in Figure 23 WITH BURNER BOX COVER IN PLACE WITH BURNER BOX COVER REMOVED FIG...

Page 24: ...een the R and W terminals The indoor fan motor is energized through the W1 heat terminal and runs on the speed selected on the HEAT tap of the control board Humidistat When a humidistat is installed i...

Page 25: ...T CODE STORAGE AND RETRIEVAL The control in this furnace is equipped with memory that will store up to five error codes to allow a service technician to diagnose problems more easily This memory will...

Page 26: ...A C 52 1 35 4 53 2 35 4 1560 1010 1620 1030 C B 44 2 28 6 45 9 29 2 1470 940 1500 960 B C 41 6 26 6 42 5 27 2 1370 890 1410 880 D B 38 8 25 2 39 9 24 9 1460 930 1490 920 C A 41 3 26 3 42 2 26 1 1250 7...

Page 27: ...in in2 cm2 In W C kPA In W C kPA In W C kPA 0 750 0 21 4 230 1484 0 01 0 00249 0 01 0 00249 0 15 0 03736 751 1000 21 25 28 32 330 2129 0 05 0 01245 0 05 0 01245 0 20 0 04982 1001 1250 28 33 35 40 330...

Page 28: ...Printed in U S A 271043 UIM B 0707 Copyright by York International Corp 2007 All rights reserved Supersedes 271043 UIM A 0407 Unitary 5005 Norman Products York OK Group Drive 73069 SECTION X WIRING D...

Reviews: