Emoji Roller GMP Manual
09/17/2022
13
5. LOCATION OPERATION INSTRUCTIONS
5.1 First Power On Operation
Step 1 Power on the machine. Open the coin door and there is a meter panel. Press
Settings button to enter the setting menu.
Step 2 Select “Replenish Ball”. The machine will replenish ball to the play area.
Test
Reset
Open the coin door and there is a
meter panel. Press Settings button to
enter the setting menu.
Settings
Summary of Contents for emoji ROLLER
Page 54: ...Emoji Roller GMP Manual 09 17 2022 53 10 2 Panel Assembly...
Page 71: ...Emoji Roller GMP Manual 09 17 2022 70 10 17 Decal Part 19 20...
Page 73: ...Emoji Roller GMP Manual 09 17 2022 72...
Page 79: ...Emoji Roller GMP Manual 09 17 2022 78 10 18 Electrical Component 1 2 3 4 5 6 7 8 9 10 11 12 13...