Operation
65
Main menu - Options - Calibration - Automatic calibration
The automatic calibration is configured in this menu.
The following must be observed for this:
Input:
Day is a list field (Su, Mo, Tu, We, etc.), Time and Cycle are value fields.
Duration of calibration:
Depending on the device type, the calibration duration is 10 - 20 min.
NOTE
At a restart of the device or at a change of calibration gas, the calibration may
have to be started multiple times until the pulse line is sufficiently flushed with
calibration gas and the stability criterion is met.
Summary of Contents for CWD2005 SPC
Page 1: ...Apr 2016 V1 06 Original Operating Instructions Combustion Calorimeter CWD2005 CWD2005 Plus ...
Page 10: ...Technical data 10 ...
Page 12: ...EU Declaration of Conformity 12 ...
Page 18: ...Safety information 18 ...
Page 22: ...Protective equipment 22 ...
Page 48: ...Description of the work stations operator control elements 48 ...
Page 63: ...Operation 63 Main menu Options Calibration Calibration values are configured in this menu ...
Page 87: ...Operation 87 ...
Page 88: ...Operation 88 ...
Page 90: ...Decommissioning Switching off 90 ...
Page 94: ...Maintenance 94 ...
Page 100: ...Troubleshooting 100 ...
Page 102: ...Service 102 ...
Page 104: ...Disposal 104 ...
Page 106: ...Spare parts 106 ...