Maintenance, Inspection and Test contd.
15
•
ENSURE
all four castors are in contact with the floor when the hoist is moved.
•
EMERGENCY DOWN:
Check emergency down functions - control box and
actuator (on 2012 models).
•
HYDRAULIC UNIT:
The hydraulic unit should require no maintenance other
than checking for correct operation and leakage of hydraulic fluid.
•
BATTERIES
(Electric only): The batteries are located in the power pack and
should not require maintenance other than the regular charging as detailed in
the charging instructions.
•
CLEANING:
Clean thoroughly with ordinary soap and water and any hard
surface disinfectant if required after cleaning (you cannot disinfect unless the
hoist is already clean). Harsh chemical cleaners or abrasives should be
avoided as these may damage the surface finish of the hoist. Avoid wetting
any of the electrical parts.
•
LOAD TEST:
The load test should be carried out in accordance with the
manufacturers test procedures. It is strongly recommended the testing is
carried out by an authorised service dealer.
•
CERTIFICATION:
An authorised service dealer will issue a test certificate
after satisfactory completion of the load test. This certificate will be valid for
six months.
SF25 Iss.5 July 2012
Summary of Contents for Graduate 150
Page 1: ...Instruction Manual for Graduate 150 Scholar 175 Master 200...
Page 3: ...Unihoist Ltd Range Graduate 150 Scholar 175 Master 200 2 SF25 Iss 5 July 2012...
Page 4: ...Unihoist Ltd Range Graduate 150 Scholar 175 Master 200 3 Hydraulic Pump SF25 Iss 5 July 2012...
Page 13: ...Correct way to charge the battery 12 SF25 Iss 5 July 2012...
Page 17: ...Technical Specifications 16 SF25 Iss 5 July 2012...