PART II: INSTALLATION
26
Siemens CD attached to the burner
Configuration with separate electrical panel (optional)
The length of the electrical cables must comply with the provisions in the technical sheets of the equipment or the advice the company
gives at the time of the offer/contract.
Provide sufficient protections for cables and connectors, taking into consideration positioning spaces and the panel-burner tracing sur-
faces. Always consult beforehand the electrical drawings supplied in relationship to the topography of the feeding systems.
Key
C - Capacitor (22 nF , 250 V)
LME / LMV - Siemens control box
R - Resistor (1M
Ω
)
M: Terminal 2 (LGB, LME), Terminal X3-04-4 ( LMV2x, LMV3x,
LMV5, LME7x)
RC466890660 - RC Siemens filter
LMV2/3.. - LMV5..
M
Summary of Contents for TLX115
Page 45: ...Service manual AZL2x LMV2x 3x Burner Management System M12916CD Rev 3 4 03 2023...
Page 52: ...8 Parameters level heating engineer...
Page 94: ...50 ERROR CODE TABLE...
Page 95: ...51...
Page 96: ...52...
Page 97: ...53...
Page 98: ...54...
Page 99: ...55...
Page 100: ...56...
Page 101: ...57...
Page 102: ...58...
Page 103: ...59...
Page 104: ...60...
Page 105: ...61...
Page 106: ...62...
Page 107: ...63...
Page 108: ...64...
Page 113: ......
Page 114: ......
Page 115: ......