MULTIBLOC DUNGS MBC300-700-1200SE (Threaded valves group)
MULTIBLOCDUNGS MBC1900-3100-5000SE (Flanged valves group
)
Siemens VGD20.. and VGD40.. gas valves - with SKP2.. (pressure governor)
Mounting
z
When mounting the VGD.. double gas valve, two flanges are required (as for VGD20.. model, the flanges are threaded);
z
to prevent cuttings from falling inside the valve, first fit the flanges to the piping and then clean the associated parts;
z
install the valve;
z
the direction of gas flow must be in accordance with the direction of the arrow on the valve body;
z
ensure that the bolts on the flanges are properly tightened;
z
ensure that the connections with all components are tight;
z
make certain that the O-rings and gaskets between the flanges and the double gas valve are fitted.
z
Connect the reference gas pipe (
TP
in figure), to the gas pressure nipples placed on the gas pipe, downstream the gas valves: gas pres-
sure must be measured at a distance that must be at least 5 times the pipe size .
Leave the blowhole free (
SA
in figure). Should the spring fitted not permit satisfactory regulation, ask one of our service centres for a
suitable replacement.
Mounting
1. Mount flange onto tube lines. Use appropriate sealing agent (see Fig. 6)
2. Insert MBC...SE. Note position of O rings (see Fig. 7).
3. Tighten screws A – H
4. After installation, perform leakage and functional test.
5. Disassembly in reverse order
Fig. 7
Mounting
1. Insert setscrews A
2. Insert seals
3. Insert setscrews B
4. Tighten setscrews A + B.
Ensure correct seating of the seal!
6. After installation, perform leakage and functional test.
7. Disassembly in reverse order.
Fig. 8
MOUNTING
POSITIONS
OPTION
S
%U
S
%U
S
%U
S
%U
PLQ['1
'1
£
Ó
S
%U
2 = Pulse lines
#
&
'
%
)
(
"
$
Fig. 6
Mounting positions
OPTION
10 = pulse lines
njo/!6!y!EO
EO
2
22
21
"
#
#
"
#
#
"
"