PART II: INSTALLATION
19
Once the gas train in installed, execute the electrical connections for all its items (gas valves group, pressure switch).
The pilot gas train is already installed to the burner, the following connections must be executed:
z
connection from the filter with stabiliser to the gas supply network
Fig. 12 - pipe port (3) for connecting the pilot gas train to the valves group of the main gas train
ATTENTION: once the gas train is mounted according to the diagram on Fig. 11, the gas proving test mus be per-
formed, according to the procedure set by the laws in force.
connection to the gas supply network
connection to the gas supply
network
3
to the burner
SIEMENS VGD40..
3
gas proving system connection (optional)