
PART II: INSTALLATION
21
GAS TRAIN CONNECTIONS
The diagrams show the components of the gas trai included in the delivery and which must be fitted by the installer.The diagrams are in
compliance with the current laws.
Key
Gas train with valves group MB-DLE (2 gas pressure governor)
Gas train with valves group VGD with built-in gas pressure governor
Gas train with valves group MB-DLE (2 gas pressure governor) + VPS504 gas proving system
Gas train with valves group VGD with built-in gas pressure go gas proving system VPS504
1
Filter (*optional)
6
Butterfly valve
2
Pressure switch - PGMIN
8
Main burner
3
Safety valve with built in gas governor 9
Manual
valve(*optional)
4
Proving system (*if provided)
10
Bellows unit(*optional)
5
Pressure switch PGMAX:included MBE, for VGD e MB-DLE Optional
GAS INLET
BY BURNER CONSTRUCTOR
BY OTHERS
GAS INLET
SUPPLIED BY BURNER
BY OTHERS
GAS INLET
BY BURNER CONSTRUCTOR
BY OTHERS
GAS INLET
SUPPLIED BY BURNER
CONSTRUCTOR
BY OTHERS