C.I.B. UNIGAS
- M039203CC
11
Gas train connections
The next diagrams show the components of the gas train included in the delivery and which must be fitted by the installer.The diagrams
are in compliance with the current laws.
Key
* Note: the high gas pressure switch can be mounted either upstream the gas valve or downstream the gas valves but upstream the
butterfly gas valve.
ATTENTION:
BEFORE EXECUTING THE CONNECTIONS TO THE GAS PIPE NETWORK, BE SURE THAT THE
MANUAL CUTOFF VALVES ARE CLOSED. READ CAREFULLY THE “WARNINGS” CHAPTER AT THE BEGINNING
OF THIS MANUAL.
Gas train with valves group MB-DLE with built-in gas pressure g VPS504 gas proving system
1
Burner
2
Butterfly valve
3
Gas proving system (option)
4
Maximum gas pressure switch (optional*)
5
Minimum gas pressure switch
6
Gas filter
7
Bellow joint
8
Manual cutoff valve
9
MB-DLE Valves group
SIDE UP
SIDE
DOWN
1
2
3
4
5
7
8
9
4
MANUFACTURER
INSTALLER