PART II: INSTALLATION
23
Integrated proving system (burners equipped with LME7x, LMV, LDU)
PS
EV1
EV2
/
EV2
EV1
PGCP
This paragraph describes the integrated proving system operation sequence:
At the beginning both the valves (EV1 and EV2) must be closed.
Test space evacuating: EV2 valve (burner side) opens and keep this position for a preset time
(td4), in order the bring the test space to ambient pressure.Test atmospheric pressure: EV2 clo-
ses and keep this position for a preset time (test time td1). The pressure switch PGCP has not to
detect a rise of pressure.
Test space filling: EV1 opens and keep this position for a preset time (td3), in order to fill the test
space.
Test gas pressure: EV1 closes and keep this position for a preset time (td2). The pressure switch
PGCP has not to detect a pressure drop down.
If all of the test phases are passed the proving system test is successful, if not a burner lockout
happens.
On LMV5x and LMV2x/3x and LME73 (except LME73.831BC), the valve proving can be parameteri-
zed to take place on startup, shutdown, or both. On LME73.831BC the valve proving is parameteri-
zed to take place on startup only.
Summary of Contents for E140X
Page 46: ......
Page 47: ......
Page 49: ...Service manual AZL2x LMV2x 3x Burner Management System M12916CD Rev 3 4 03 2023...
Page 56: ...8 Parameters level heating engineer...
Page 98: ...50 ERROR CODE TABLE...
Page 99: ...51...
Page 100: ...52...
Page 101: ...53...
Page 102: ...54...
Page 103: ...55...
Page 104: ...56...
Page 105: ...57...
Page 106: ...58...
Page 107: ...59...
Page 108: ...60...
Page 109: ...61...
Page 110: ...62...
Page 111: ...63...
Page 112: ...64...
Page 117: ......
Page 118: ......
Page 119: ......
Page 121: ...IG FU B...
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......