PART II: INSTALLATION
17
GAS TRAIN CONNECTIONS
The diagrams show the components of the gas train included in the delivery and which must be fitted by the installer.The diagrams are
in compliance with the current laws.
Procedure to install the double gas valve unit:
two (2) gas flanges are required; they may be threaded or flanged depending on size
first step: install the flanges to prevent entry of foreign bodies in the gas line
on the gas pipe, clean the already assembled parts and then install the valve unit
check gas flow direction: it must follow the arrow on the valve body
VGD20: make sure the O-rings are correctly positioned between the flanges and the valve
VGD40 and MBE: make sure the gaskets are correctly positioned between the flange
fasten all the components with screws, according to the following diagrams
make sure bolts on the flanges are properly tightened
To mount the gas train, proceed as follows:
NOTE:
the bellows unit, the manual cutoff valve and the gaskets are not part of the standard supply
WARNING: before executing the connections to the gas pipe network, be sure that the manual cutoff valves are
closed.
ATTENTION: it is recommended to mount filter and gas valves to avoid that extraneous material drops inside the
valves, during maintenance and cleaning operation of the filters (both the filters outside the valves group and the
ones built-in the gas valves).
ATTENTION: once the gas train is mounted, the gas proving test must be performed, according to the procedure
set by laws in force.
1
-
In case of threaded joints: use proper seals according to the gas used- in case of flanged joints: place a gasket between the ele-
ments
2
Fasten all the items by means of screws, according to the diagrams showed, observing the mounting direction for each item
Keys
1A..1E Gasket
2 Gas filter
3 Gas valves group
4 Bellows unit
5 Manual valve
”direction” arrows for installation
gas supply network
Note: the figure is indicative only
1A
1B
1C
1D
1E
2
4
5
3
Summary of Contents for E140X
Page 46: ......
Page 47: ......
Page 49: ...Service manual AZL2x LMV2x 3x Burner Management System M12916CD Rev 3 4 03 2023...
Page 56: ...8 Parameters level heating engineer...
Page 98: ...50 ERROR CODE TABLE...
Page 99: ...51...
Page 100: ...52...
Page 101: ...53...
Page 102: ...54...
Page 103: ...55...
Page 104: ...56...
Page 105: ...57...
Page 106: ...58...
Page 107: ...59...
Page 108: ...60...
Page 109: ...61...
Page 110: ...62...
Page 111: ...63...
Page 112: ...64...
Page 117: ......
Page 118: ......
Page 119: ......
Page 121: ...IG FU B...
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......