18
11
4 1
1 2
1 3
3 1
3 2
4 2
18:28 giov 30
20
ott
18
effettiva
richiesta
76°C
84°C
generatore
10/10
modulazione
100%
INFO
MENU
status
sanitaria
25°C
W
W
H
H
L
L9
SPK
CLEArANCE mm
W
L
L9
H
1000
2000
3800
1000
1000
OPENING DOOR
ATTENTION
before opening the door, (right side) is
necessary:
- Close the gas cock on the pipe
power supply (burner upstream of the separa-
tion point between the power supply line and
the burner)
- Disconnect the Gas / Burner pipe
- remove the 4 screws indicated and extract
the burner group (‘’ A ‘’ sledge)
- remove the 6 front casing screws
(upper lower and left side)
3.5 -
POSITIONING IN BOILER
ROOM
The boiler must be installed in compliance with standards and
prescriptions in force.
The room must be well ventilated by openings with a total surface
no less than 1/30 the surface of the boiler room, with a minimum
of 0.5 m².
The ventilation openings must be permanent, communicate
directly with the outside and be positioned high or low according
to standards in force.
The location of the ventilation openings, the fuel supply circuits,
electric energy supply and lighting must comply with current legal
provisions in relation to the type of fuel used.
It is recommended to install the boiler as close to the chimney
connection as possible.
To make it easier to clean the smoke circuit, in front of the boiler,
there must be a free space no less than the length of the boiler
body and, in any case, never less than 1300 mm. Check that
with the door opened 90°, the distance between the door and
the adjacent wall is at least the length of the burner.
The boiler can be placed directly on the floor as it is equipped
with a base.
However it is useful to provide a flat, level cement plinth capable
of bearing the weight of the boiler full of water.
When positioned on the plinth, the dimensions must be at least
B
x
A
(see dimensions table).
When installation has been performed, the boiler must be perfectly
horizontal and stable (to reduce vibrations and noise).
Comply with the minimum overall dimension
distances in order to execute normal
maintenance and cleaning operations.
Summary of Contents for SPK 1000
Page 35: ...35 Maintenance instructions ENGLISH PAGE LEFT BLANC INTENTIONALLY ...
Page 42: ...42 ...
Page 43: ...43 ...