Safety And Leakage Check
Electrical safety check
Perform the electrical safety check after
completing installation. Cover the following
areas:
1. Insulated resistance
The insulated resistance must be more
than 2M
Ω
.
2. Grounding work
After finishing grounding work, measure
the grounding resistance by visual detection
and using the grounding resistance tester.
Make sure the grounding resistance is less
than 4
Ω
.
3. Electrical leakage check (performing during
test while unit is on)
During a test operation after completed
installation, the use the electroprobe and
multimeter to perform an electrical leakage
check. Turn off the unit immediately if
leakage happens. Try and evaluate different
solutions until the unit operates properly.
Gas leak check
1. Soap water method:
Apply a soap-water solution or a liquid
neutral detergent on the indoor unit
connection or outdoor unit connections with
a soft brush to check for leakage of the
connecting points of the piping. If bubbles
emerge, the pipes are experiencing leakage.
2. Leak detector
Use the leak detector to check for leakage.
NOTE:
The illustration is for example purposes
only. The actual order of A, B, C, D, and E on
the machine may be slightly different from the
unit you purchased but the general shape will
remain the same.
Indoor unit
check point
Outdoor unit
check point
A, B,C,D are points for one-four type.
A, B,C,D, and E are points for the one-five type.
Fig. 9.4
25
Summary of Contents for MULTI XMX2 18HE
Page 1: ...ENGLISH INSTALLATION MANUAL XMX2 18HE XMX3 21HE KMX4 28HE KMX4 36HE XMX5 42HE...
Page 18: ...0 1 2 3 4 5 678 9 2 3 5 678 9 2 3...
Page 34: ......
Page 51: ...0 0 1 2 0 3 45 6 317 89 90 6 6 6 6 4 45 6 317 89 90 6 6 6 6 4...
Page 67: ......
Page 68: ...X...
Page 69: ...X...
Page 70: ...a 5 52 1 8 a K...
Page 71: ...EEV Cn20 M 5 6 A Cn21 M 5 6 B Cn17 M 5 6 C Cn19 M 5 6 E Cn18 M 5 6 D...
Page 72: ...EEV Cn20 M 5 6 A Cn21 M 5 6 B Cn17 M 5 6 C Cn19 M 5 6 E Cn18 M 5 6 D X...
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ...G...