Instructions for the installer
Before commissioning the boiler ensure that the following
operations are carried out:
- Open the gas meter cock and vent the air contained in the
piping and subsequently proceed to vent device by device.
- Check, with the gas cock turned off, that there are no gas
leaks. During the 2nd quarter of the hour from the start of the
test, no pressure reduction should be detected by the
pressure gauge.
Any gas leaks must be found by using only water soap
solutions, or an equivalent product, and eliminated.
Never look for gas leaks using a naked flame