background image

13

Installation info

fig.8

2.2.1 - PACKING

EVE 05

 is delivered completely assembled and

packed in a strong cardboard box. Once the
boiler has been unpacked check that it is in-
tact.

750

430

330

Keep the packaging material
(cardboard box, plastic strips,
plastic bag, etc.) out of the
reach of children as it represen-
ts a choking and suffocation
hazard.

In addition to the boiler packaging contains:
-

a bag with:

-

installation, use and maintenance
handbook,

-

template for fixing the boiler to the wall,

A bag containing:
-

2 dowels with screws hook to fix the boiler
to the wall,

-

Only for models 

TFS,

 a diaphragm for flue

gas outlet

UNICAL  refuses all liability
for injury to persons and ani-
mals or damage to property
resulting from non-observan-
ce of the above.

2

DIRECTIONS FOR
INSTALLER

2.1 - DIRECTIONS FOR

INSTALLER

EVE 05 

 is a gas boiler which must be instal-

led in accordance with the latest regulations
or rules in force. For the boiler category,
which changes according to the destination
country, see page 6.

NOTE:

Observe the corresponding technical rules and
the building supervisory and statutory
regulations of the country of final use when
installing and operating the system.

Always ensure that an appropriately specialised
company is entrusted with installation, gas
supply and flue gas connection, commissioning
and power supply connection, as well as all
servicing and repair work.
Work on gas conduits and fittings must only
be carried out by a registered service provider.
The system must be cleaned and serviced once
a year. This includes an inspection of the entire
system to see if it is in full working order.
Defects and faults must be eliminated

immediately.
Please note that we can accept no liability
whatsoever for loss or injury resulting from
unauthorised adjustment or manipulation of the
system’s control or regulating devices.

2.2 - INSTALLATION

Only for the TFS (room sealed fan assisted)
models a bag containing: 
-

2 sealed room closing 2 sealing
gaskets and the fixing screws.  “ 

Summary of Contents for EVE 05 RTN 24

Page 1: ...EVE 05 RTN 24 RTFS 24 CTN 24 F CTFS 24 F CTN 24 CTFS 24 00332243 3rd edition 10 2010 INSTALLATION USE AND MAINTENANCE English...

Page 2: ...be used for all repairs to the boiler Non observance of the above requirement may jeopardize the safety of the boilers and expose people animals and property to danger To guarantee efficiency and corr...

Page 3: ...here is a suspicion of gas leak Contact IMMEDIATELY the technical personnel DON T SEEK GAS LEAKS WITH NAKED FLAMES LACK OF WATER If the pressure decreases repeatedly below the minimum operational pres...

Page 4: ...required tem perature you will avoid to mix hot wa ter with cold water in this way reduc ing both the boiler operation costs and the scaling formation Winter operation Central Heating Domestic Hot Wat...

Page 5: ...valve CLEANING For the simple cleaning use a dry cloth To remove hard blots clean with a wet cloth and wipe with a dry cloth DO NOT USE abrasive products ANTIFROST PROTECTION The boiler is equipped wi...

Page 6: ...03 1 18 F factor N stars based on the quality of water declared EN 13203 1 19 PMW Max pressure D H W system 20 T max Max temperature D H W system C Electrical features 21 Electrical power supply 22 Co...

Page 7: ...ischarge and suction pipe configuration pag 17 2 2 7 Positioning of terminals for type C boilers pag 18 2 2 8 Smoke evacuation 80 air suction flange pag 19 2 2 9 Discharge of flue gas into coaxial duc...

Page 8: ...ic ignition Models in the EVE 05 series are the following EVE 05 CTN 24 F open boiler with electronic ignition and instantaneous D H W produc tion EVE 05 RTN 24 open boiler with electronic ignition fo...

Page 9: ...pressure switch 18 By pass unadjustable 19 Boiler drain cock 20 Heating circuit safety valve 21 Filling valve C D H W outlet F D C W inlet G Gas inlet R C H system return M C H system flow 1 Flow swit...

Page 10: ...g circuit safety valve 18 Filling valve F D C W inlet G Gas inlet R C H system return M C H system flow 1 Gas valve 2 Burner nozzles 3 Ionisation Ignition electrode 4 Burner 5 Monotermal heat exchange...

Page 11: ...alve motor 22 Boiler drain cock 23 Diverting valve 24 Heating circuit safety valve 25 Filling valve C D H W outlet F D C W inlet G Gas inlet R C H system return M C H system flow 1 Flow switch Cold wa...

Page 12: ...e boilers are used in low tem perature heating system ex floor hea ting it is necessary to use a mixing valve to avoid condensation phenomena 1 4 OPERATING DATA Nominal output Minimum output Actual wa...

Page 13: ...r rules in force For the boiler category which changes according to the destination country see page 6 NOTE Observe the corresponding technical rules and the building supervisory and statutory regulat...

Page 14: ...in partitions avoid installing the boiler above applian ces which might affect operation when in use cookers which produce greasy steam washing machines etc avoid installing natural draught boilers in...

Page 15: ...duct must have a vertical section with a length more than twice the diameter before get ting into the chimney 2 2 5 FLUE GAS DISCHARGE SYSTEM NATURAL DRAUGHT OPEN FLUE BOILERS Connection to the chimne...

Page 16: ...rom the wall of the building for a length of at least twice the diameter of the duct the draught terminal must overlap the con nection to the boiler by at least 1 5 m see fig 8 DIMENSIONS FOR CONNECTI...

Page 17: ...including two ducts one for the suction of combustion air and the other for the exhaust of the combustion products through coaxial or dual ducts The chimney must comply with relevant applicable law pr...

Page 18: ...of the building I 300 From the ground or from another floor L 2500 Between two vertical terminals M 1500 Between two horizontal terminals N 1000 From a facing front surface without opening or teminals...

Page 19: ...ter minal For this type of installation the chim ney has to serve just one boiler i e the boiler must have its indipendent smo ke duct WARNING For the installation where there is a freezing risk it i...

Page 20: ...phragm 42 supplied with the boi ler must be inserted in the flue gas exhaust pipe as shown in figure 15 for installa tions with horizontal coaxial pipe up to 1 m and with vertical coaxial pipe up to 2...

Page 21: ...a convenient insulation of such a duct The flue duct during the operation of the boiler can reach tempera tures higher than 120 C IMPORTANT Flue gas pressure switch operation The boiler is fitted with...

Page 22: ...KE AND THE FLUE GAS DISCHARGE WITH DUAL DUCTS _ 500 Hmin 150 mm CONFIGURATIONS FOR SEPARATE PIPES SUCTION AND OUTLET 80 Example N 1 Primary air suction from perimeter wall and flue gas discharge on ro...

Page 23: ...let terminal the pressure loss is 3 Pa for the 80 L 0 6 m horizontal discharge end section the pressure loss is 5 Pa NB These values refer to dis charges through original UNI CAL non flexible and smoo...

Page 24: ...test no pressure reduc tion is to be detected on the gas pressure gauge If gas leaks have to be found use only water soap solution or any other spe cific gas leak detector which can be avai lable on...

Page 25: ...2 0 0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000 1050 1100 1150 1200 1250 1300 1350 1400 V1 V2 V3 6 2 6 0 5 8 5 6 5 4 5 2 5 0 4 8 4 6 4 4 4 2 4 0 3 8 3 6 3 4 3 2...

Page 26: ...code 95600259 M1 CP A fig 24 B B Open the rear cover CP and replace the cable A connector A7 The female faston of the hearting cable has to be connected on the male faston GND 1 Connection of the ON...

Page 27: ...Minimum water pressure switch SR C H sensor FL Flow switch SS Rotary flow switch only for CTN CTFS MVD Motor 3 way valve optional for only heating boiler MD Modulating coil MD MODULATING COIL DK MINI...

Page 28: ...boiler s safety valve is not locked there are no water leaks SWITCHING ON AND OFF To switch on and off the boiler follow the indications in the Users Instructions Filling position fig 26 Normal posi t...

Page 29: ...m capacity F blinking L fixed when the burner is ignited check that the MAXIMUM pressure value cor responds to that indicated on the table NOZZLES PRESSURES Correct eventually the value rotating the n...

Page 30: ...e them with those with a diame ter corresponding to the new type of gas see table INJECTORS PRESSURES reassemble the main burner position the jumper on the modulation PCB in the panel board as shown i...

Page 31: ...he pump and eventually descale the heat exchanger 2 10 4 Difficult smoke evacuation priority 4 Description Difficult smoke evacuation Possible solution TN boilers verify the chimney draught or the smo...

Page 32: ...ections 2 10 10 Factory parameters priority 10 Description Factory parameters alteration Possible solution with the access code reset the 13 factory parameters 2 10 11 Flame control priority 11 Descri...

Page 33: ...ted by the arrow on the illustration it means that the boi ler always gives priority to the pro duction of domestic hot water if it is requested and controls the temperature of the water of the heatin...

Page 34: ...E 05 CTN CTFS C B B SWITCHING OFF Put the B knob on the SUN position and the C knob to the minimum Switch OFF the boiler by acting on the external main switch provided the antifrost protection is not...

Page 35: ...ignite a gas cooker If so wait one minute before resetting the boiler by depressing the L push button If the boiler does not start and goes into lockout position after three times just once if is ope...

Page 36: ...60556 The Unical declines every responsibility for the possible inaccuracies if owed to errors of transcript or press Also reserves the right to bring those changes that it will hold necessary to it o...

Reviews: