Bolt
Tele2
Pipe for cord reel
Spool
Seletor valve ass’y
Check valve 2
1
4
-1
How oil flows when tele1 is extended
Pressure oil opens the check valve in the counter-balance valve to
enter the cylinder rod of t
ele1 and lows through the slide pipe to
reach the check valve 1 of selector valve ass’y.
The tele2 has been fully retracted at the time and the bolt opens the
check valve 1 of selector valve ass’y via spool which leads the pressure
oil to the extension side.
Simultaneously, oil in the retraction side of tele1 lows through the
dual cylinder in the rod to return to the tank.
This allows the tele1 to extend.
Since the check valve 2 of selector valve ass’y is closed at the time,
pressure oil will not lows in the tele2.
Also, oil in the retraction side of tele2 will not lows in the tele1 as
the tele2 has been fully retracted so that the tele2 will not be actuated.
And the tele3 also will not be actuated according to the same
reasons as in the tele2.
14-1
5-Section Boom (Triple Cylinder) Operation
(1) When Telescoping Cylinder1 extends
1
4
. TELESCOPING CYLINDER
After the set-screw is tightened with LOCTITE #2701
applied hit with a punch at 2 places on the
circumference and leave it as it is for 1 hour.
Rod
Check
valve
Pressure Oil
To Tank
Slide pipe
Piston
Apply"LOCTITE #638".
Check valve 1
Counter-balance
valve
Tele1
Tele2
Tele3
Counter-balance
valve
Summary of Contents for URW295CUR
Page 1: ...URW295CUR URW295CUR URW295CAR URW295CAR Courtesy of Machine Market...
Page 2: ...Courtesy of Machine Market...
Page 6: ...A I O C I C I R R L L F L L L y y URW 95CUR y URW 95CAR Courtesy of Machine Market...
Page 20: ...7 O 7 5 R R ON D ON F V D OFF ON D y D ON R OFF R O 7 Courtesy of Machine Market...
Page 23: ...Courtesy of Machine Market...
Page 27: ...Courtesy of Machine Market...
Page 28: ...Courtesy of Machine Market...
Page 29: ...Courtesy of Machine Market...
Page 35: ...Courtesy of Machine Market...
Page 80: ...Courtesy of Machine Market...
Page 84: ...Courtesy of Machine Market...
Page 85: ...Courtesy of Machine Market...
Page 101: ...22 1 Construction of slipriing 22 1 Courtesy of Machine Market...
Page 103: ...23 2 23 2 Boom top in detail Courtesy of Machine Market...
Page 113: ...Courtesy of Machine Market...
Page 116: ...WIRE ROPE RETAINING MECHANISM Limit switch 750306029 25 1 Courtesy of Machine Market...
Page 131: ...Courtesy of Machine Market...