Inspection and Maintenance which is to be
carried out every 250 hours or 3 months
1. Check/Cleaning of air cleaner element
★
Do not make a cleaning and a replacement of air cleaner while engine
is running.
★
If the crane is operated in dusty environment, shorten the time when
making inspection and cleaning accordingly.
Check and clean the air cleaner element when
the crane has been operated for 250 hours (3
months).
1
Unfasten the clamps to remove the air
cleaner cover.
2
Clean the air cleaner element.
WARNING
CAUTION
Cleaner cover
Clamp
Cleaner case
Grid
Cleaner element
MAINTENANCE AND INSPECTION OF CARRIER
( 28 - 8 )
Summary of Contents for URW295CUR
Page 1: ...URW295CUR URW295CUR URW295CAR URW295CAR Courtesy of Machine Market...
Page 2: ...Courtesy of Machine Market...
Page 6: ...A I O C I C I R R L L F L L L y y URW 95CUR y URW 95CAR Courtesy of Machine Market...
Page 20: ...7 O 7 5 R R ON D ON F V D OFF ON D y D ON R OFF R O 7 Courtesy of Machine Market...
Page 23: ...Courtesy of Machine Market...
Page 27: ...Courtesy of Machine Market...
Page 28: ...Courtesy of Machine Market...
Page 29: ...Courtesy of Machine Market...
Page 35: ...Courtesy of Machine Market...
Page 80: ...Courtesy of Machine Market...
Page 84: ...Courtesy of Machine Market...
Page 85: ...Courtesy of Machine Market...
Page 101: ...22 1 Construction of slipriing 22 1 Courtesy of Machine Market...
Page 103: ...23 2 23 2 Boom top in detail Courtesy of Machine Market...
Page 113: ...Courtesy of Machine Market...
Page 116: ...WIRE ROPE RETAINING MECHANISM Limit switch 750306029 25 1 Courtesy of Machine Market...
Page 131: ...Courtesy of Machine Market...