background image

19

20

5) According to the wire connection interface (Fig. 11), clamp L2 live wire, connect L2 live 
    wire with test lead from V terminal, and connect neutral wire with test lead from COM 
    terminal, then press “HOLD” button to enter P2 measurement interface, as shown below:

The finger symbol on “HOLD” segment flashes to indicate pressing “HOLD” button to enter 
P3 wire connection interface.

6) In P2 measurement interface, after the displayed value stabilizes, press “HOLD” button to 
    enter P3 wire connection interface, as shown below:

“L3” on top right corner indicates the jaws clamp L3 live wire, “n” on bottom left corner 
indicates test lead from COM terminal connects with neutral wire, “L3” on bottom right 
corner indicates test lead from V terminal connects with L3 live wire. The finger symbol on 
“HOLD” segment flashes to indicate pressing “HOLD” button to enter P3 measurement 
interface.

7) According to the wire connection interface (Fig. 11), clamp L3 live wire, connect L3 live wire 
    with test lead from V terminal, and connect neutral wire with test lead from COM terminal, 
    then press “HOLD” button to enter P3 measurement interface, as shown below:

The finger symbol on “HOLD” segment flashes to indicate pressing “HOLD” button to enter 
phase-combined active power interface.

UT219P User Manual

UT219P User Manual

8) In P2 measurement interface, press “HOLD” button to read phase-combined active power, 
    press SELECT button to cyclically read phase-combined active power, phase-combined 
    apparent power, phase-combined reactive power, phase-combined phase angle, P1 active 
    power, P2 active power and P3 active power, as shown below:

Main display: Phase-combined 
reactive power
Auxiliary display 1: Phase-combined 
power factor

Main display: Phase-combined 
apparent power
Auxiliary display 1: Phase-combined 
power factor

Main display: Phase-combined 
active power
Auxiliary display 1: Phase-combined 
power factor

Main display: Phase-combined 
phase angle
Auxiliary display 1: Phase-combined 
power factor

Main display: First active power
Auxiliary display 1: P1 prompt
Auxiliary display 2: Voltage
Auxiliary display 3: Current

Main display: Second active power
Auxiliary display 1: P2 prompt
Auxiliary display 2: Voltage
Auxiliary display 3: Current

Main display: Third active power
Auxiliary display 1: P3 prompt
Auxiliary display 2: Voltage
Auxiliary display 3: Current

Short press

Short press

Short press

Short press

Short press

Short press

Short press

Note:

    Phase angle is in reference to voltage.
    Do not input voltage over 1000V. It is possible to measure higher voltage, but it may damage 
    the clamp.
    Avoid electric shock when working with high voltage.
    Disconnect test leads with the measured circuit after all measurement operations are 
    completed.
    The high voltage warning symbol “     ” will appear on the LCD if the measured voltage is over 
    30V AC; the red backlight flashes if the measured voltage is over 1000VAC.
    Do not release the trigger abruptly when pressing and holding it. Hall sensor is sensitive to 
    magnet, heat and mechanic stress, impact can cause reading variation in a short time.
    To ensure measurement accuracy, please place the measured conductor at the center of the 
    clamp jaws. Error of ±1.0% of reading will be produced if the measured conductor is not placed 
    at the center of the clamp jaws.
    Incorrect wire connection will cause negative active power and cause the red backlight to 
    flash, please check if the connections of voltage input terminal and clamp jaws are correct.

5. Harmonic analysis

5.1 Current harmonic analysis (Fig. 4)

1) Set the rotary switch to “HARM”, press SELECT button to select AC current harmonic analysis. 

Press the trigger to clamp the measured conductor and then release the trigger slowly until 
the clamp jaws closes completely. Make sure that the measured conductor centers at the 
clamp jaws, error will be produced if the measured conductor does not centers at the clamp 
jaws. The clamp can only measure a current conductor at a time, if it measures two or more 
current conductors at the same time, the reading will be incorrect.

2) Press “     ” or “      ’ to read THD %f, THD %r, RMS of harmonic component of each order, 

    and harmonic ratio of harmonic component of each order to fundamental wave, for examples:

Δ

Δ

Summary of Contents for UT219P

Page 1: ...P N 110401111507X UT219P AC Digital Power Clamp Meter User Manual...

Page 2: ...end guarantees that the product is free from any defect in material and workmanship within one year from the purchase date This warranty does not apply to damages caused by accident negligence misuse...

Page 3: ...1000V AC 4 1000V AC RMS voltage measurement 15Hz 1000Hz frequency response range 5 1000A AC RMS current measurement 15Hz 1000Hz frequency response range 6 Ability to measure and display RMS and peak...

Page 4: ...uracy Remove the battery if the product is not used for a long time 10 Do not alter the internal wiring to avoid product damage and safety hazard 11 Do not keep or use the product in environments with...

Page 5: ...ctor 4 3P3W 3 phase 3 wire measurement mode 5 3P4W 3 phase 4 wire measurement mode 6 UNBALANCED Unbalanced measurement mode 7 MAX Maximum value measurement 8 MIN Minimum value measurement 9 AVG Averag...

Page 6: ...ximum value minimum value average value on the main display and to record the time of capturing maximum and minimum values Long press this button to exit maximum minimum value measurement The measurem...

Page 7: ...ip already with V terminal and black connected with black alligator clip already with COM 2 Set the rotary switch to A V press SELECT to select AC voltage measurement and connect the alligator clips w...

Page 8: ...lamp jaws are correct L1 R A L2 S B L3 T C Red Black Power supply AC 3 phase 3 wire power measurement 3P3W balance Load 4 3 phase power measurement 4 1 3 phase 3 wire 3P3W balanced mode Fig 8 Fig 8 UT...

Page 9: ...voltage Auxiliary display 3 AC current Short press Short press Short press Short press Short press 4 3 3 phase 3 wire 3P3W unbalance mode Fig 10 L1 R A L2 S B L3 T C Red Black Power supply AC 3 phase...

Page 10: ...alligator clip already with V terminal and black connected with black alligator clip already with COM 2 Set the rotary switch to 3PW press to select 3P4W unbalance mode then the clamp enters P1 wire c...

Page 11: ...ower Auxiliary display 1 P1 prompt Auxiliary display 2 Voltage Auxiliary display 3 Current Main display Second active power Auxiliary display 1 P2 prompt Auxiliary display 2 Voltage Auxiliary display...

Page 12: ...at the center of the clamp jaws Error of 1 0 of reading will be produced if the measured conductor is not placed at the center of the clamp jaws If zero crossing of harmonic does not meet the zero cr...

Page 13: ...tronic meter Press Hold to start accumulation when the LED flashes for one time press HOLD again to stop accumulation when the LED flashes again as shown below Electronic Meter LED flashes for one tim...

Page 14: ...ace of wire connection Fig 13 within 10 seconds connect test lead from V terminal with L3 live wire and connect test lead from COM terminal with L2 live wire then three kinds of testing results will b...

Page 15: ...al error of temperature coefficient is 0 1 specified accuracy C To ensure measurement accuracy please place the measured conductor at the center of the clamp jaws Error of 1 0 of reading will be produ...

Page 16: ...angle error 3 5 Phase angle 15Hz 40Hz 70Hz 1000Hz 40Hz 70Hz 1000A AC 1000Vrms 0 1 3 5 5 Range Resolution Accuracy Overload protection Remark Min measured voltage 30V Max measured current 10A 180 adva...

Page 17: ...ment result viewing button control and other operations can be achieved through UNI T Smart Measurement APP 3 2 UNI T Smart Measurement APP has multiple functions including Bluetooth communication dat...

Reviews: