![Uni-Hydro PRO 56 Owner'S Manual Download Page 2](http://html1.mh-extra.com/html/uni-hydro/pro-56/pro-56_owners-manual_3669363002.webp)
TABLE OF CONTENTS
PAGE
FOREWORD
1
MACHINE SETUP INSTRUCTIONS
2-3
Machine Location
2
Machine Preparation
2
Electrical Connections
2
Lubrication
3
OPERATING INSTRUCTIONS
3-6
Pre-Operating Instructions
3
Practice Operations
3-4
Operating the Model PRO56 Ironworker
4
Stroke Control Adjustment
4
Punching Operation
4-5
Sever Angle Shear Operation
5
Notcher Station Operation
5
Bar Shear Operation
5-6
MAINTENANCE
6-7
Punch Installation
6
Double Locking the Punch
6
Removing and Replacing Angle and Bar Blades
7
Standard Angle Shear
7
Machine Maintenance
8
LUBRICATION
8-9
Machine Components
8
Hydraulic System
8
Oil Level
8
Lines and Fittings
8
Hydraulic Oil Change
9
Tonnage Chart
10
TROUBLE SHOOTING
11
Proper Care of Punches and Dies
12
Lining up Punch and Die
12
Lubrication
12
Stripping
12
Loose Nuts and Shank
12
WARRANTY
13
General Wiring Schematic
14
GE Control Box
15
Summary of Contents for PRO 56
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ...0668...
Page 45: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 73: ...Over 20 000 Punch Die Sets in stock For 66 ton Up...