
Compressor Unit Instruction Manual
ULVAC CRYOGENICS INCORPORATED
3-1
3. INSTALLATION
Connecting Cooling Water Piping ........................................................... 3-2
Connecting the Compressor Unit to the Cryopump ................................ 3-5
Connecting Electrical Cables .................................................................. 3-7
3.1
Installation
1.
Place the compressor unit on a level floor within 5
º
.
2.
The compressor unit must be operated in proper room temperature (10°C - 38°C).
Avoid dust and moist.
3.
Leave the spaces as shown in Figure 3-1 for easier maintenance processes including;
・
Pressure gauge inspection.
・
Gas charge valve operation.
・
Adsorber replacement.
Figure 3-1
Maintenance Space(Unit: mm)
500
500
543
1543
332
432
50
50
Summary of Contents for C15T
Page 2: ......
Page 8: ...F 6 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 14: ...S 4 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 16: ...IW 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 34: ...Operation 4 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 38: ...Disconnection and Storage 5 4 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 46: ...Maintenance 6 8 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 50: ...Troubleshooting A 4 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 54: ...Circuit Diagram B 4 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 57: ...Flexible Hose C 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 61: ...CS 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 63: ...Revisions R 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...