background image

• 

Solaris LED Module And PCO Reactor 

• Four self tapping screws

• Two wire nuts 

• 24VAC Power cord

• 

40 VA 24 volt ac transformer

• 

Warranty card

• 

Ductboard plate / sealing tape

•      Product gasket

Package Contents:

Mechanical installation

       

1. 

Determine a location for the Solaris system. Mount the unit on the exit or supply side of the 

HVAC system and before the ductwork branches off.

2.

 Separate the power module from the mounting plate. 

3. 

Note the orientation of the power module as it connects in only one direction. 

4.

 Mark a 4” round opening (or use the end of the PCO chamber to mark the area) on the air duct 

and cut the hole needed for the insertion of the advanced photocatalytic chamber. 

5. 

Thread supplied gasket over PCO module and attach to mounting plate. (Seals against

air duct.)

6. 

Insert the mounting plate / PCO module into opening and attach to duct with two supplied self 

-tapping screws in the lower left and upper right

(only). 

7.

 Adjust purification level. (See next page)

8.

 Place the power module on the unit aligning holes in tabs with holes in mounting plate (upper 

left /lower right). 

9.

 Secure the power module to the mounting plate with the remaining two self-tapping screws.

 

 

 

 

 

 

Installation procedure for duct board plate

Position duct board plate in the center of the duct 

board.

Trace and cut or simply cut in the outer slots pro-

vided.

Bend mounting tabs inwards being sure 

they bend at the furthest outside slot.

 Now bend inner mounting tabs at the slots 

provided so they will wrap around 

the duct board. 

The duct board plate is to be used on 1” to 1-1/2” 

duct board.

Seal edges with provided precut foil back 

 tape. 

Module Replacement Procedure:

The UVLED-ION Module is shipped installed in the equipment

 and should be replaced during biannual service. 

To replace the module follow the steps below

:

1.

 Unplug power cord and remove power module cover .

2. Remove used Module ( caution ion pins are sharp)

3.

 Install new Module ( press into place)

5.

 re-install cover by snapping it into place.

6.

 plug power cord in to base of new module, re-apply power.

Common

120

208

240

277

VAC

24 VAC

Electrical installation

This product operates on 24 VAC must be connected to a dedicated minimum 40va trans-

former supplied

1. Disconnect power supply before beginning installation to prevent electrical shock or 

equipment damage.

2. Connect secondary voltage. Refer to voltage color or terminal coding on transformer 

for proper wire combination. On terminal type transformer, be sure that no exposed wire 

can come in contact with any terminal.

3. Connect primary voltage. Refer to voltage color coding on transformer for proper wire 

combination. See Fig. 1 for connection and installation.

4. Tape or protect all unused exposed wire separately to avoid a possible electrical short.

5. Check installation and reconnect power supply for proper operation. 

6. Connect 24 VAC wires to supplied 6 ft cable (polarity not important)

Typical multi-tap transformer included

Position

Actuators

Closed

Position

Actuators

Open

The PCO Panels ship in the closed position. Only open for operation after 

mechanical installation. Never move the panels by hand only use the actuators

Reviews: