Fixings Identification

Lay out the DPC roll around the perimeter of the 

base where walls are to be positioned, aligning 

to the outside edge. Once walls and cills are in 

place the excess can be trimmed away.

1

Installation

Reposition brackets over drilled holes. Fix the 

bracket down to the slab using anchor fixings 

provided (SLP005) ensuring you are fixing into 

a substantial base. 

4

Align steel angles to the edge of the column 

and to the top of the column structural bracket 

and secure to the column using NRTF050 (4.2 

x 25mm wafer head screws) through the pre-

punched holes.

7

Evenly position cill on slab/base sealing any 

joints with an appropriate sealant. Check  level 

and  diagonals  to  ensure  square  and  fix  cill  in 

place to aid positioning. 

2

Lift column into place and fix to the structural 

bracket using fixings from SLP005 kit. Ensure 

that the tall columns are positioned to the front 

of the structure.

Repeat steps 3, 4 and 5 for each of the four 

columns.

Fitters Tip:

 Packers can be placed temporarily 

on the cill under the column to alleviate column 

wobble.

5

Measure back from the internal frame (this 

datum is provided by the cill) by 189mm to the 

inside face of the insulated column structural 

bracket. Mark hole positions, remove bracket 

and drill marked positions using a Ø10mm drill 

bit. 

3

Lift the walling panels into place starting at the 

ends before filling in towards the middle. 

9

Attach the column infill plate to the front column  

on the faces adjacent to the garden room 

projection. Aligning it with the top and internal  

faces of the column timber.  Fixing in place 

using NRTF050 through the pre-cut holes.

8

Front

Apply sealant along the top surface of the cill 

where walls are located. Position the walling 

base trays centred between columns and 

hard up against the cill. Check the tray is level 

and fix down to slab using appropriate fixings 

through the pre-punched holes in both internal 

and external steels. Ensure the tray is level and 

pulled down tight to the slab. 

6

Summary of Contents for Gardenrooms The Studio

Page 1: ...The Studio Gardenrooms By Ultraframe Installation Guide I Version 1 0...

Page 2: ...Pozi drive Bit 5mm Wide Flat Blade Screwdriver Hack Saw Drill Screwdriver Long nose pliars Gasket Shears Snips 4 5mm Drill Bit 10mm Drill Bit Sealant Gun 2 x 5mm Allen Keys Vic fixing kit 17mm Open En...

Page 3: ...4 5 Component Identification Component Identification...

Page 4: ...of the structure Repeat steps 3 4 and 5 for each of the four columns Fitters Tip Packers can be placed temporarily on the cill under the column to alleviate column wobble 5 Measure back from the inter...

Page 5: ...gonally fixing into the column through the OSB tray pulling the two components together Ensure the top trayislevelandflushwiththetopsoftherearcolumns Fitters Tip A timber block can be temporarily fitt...

Page 6: ...our eaves end caps and slide into respective places 38 28 28 69 35 Prepare the two eaves beam end caps as shown to be used with the front eaves beam above the tall columns 37 Apply sealant along the t...

Page 7: ...zing support at eaves and press glazing down firmly 54 Direction of slope This cavity to be upslope Place the aluminium top caps onto a protected surface Slideclipsintoeachbar positiondown from ridge...

Page 8: ...y to cut the insulation for ease of fitting sealthesejointsusingfoiltape LVFT045 FittersTip Cutinsulationinhalfforeaseoffitting 69 535 95 For Garden Room with glazing only x2 Fit end profile to modest...

Page 9: ...olicy to continually seek to improve its products processes and services and we reserve the right to change specifications without prior notice Ultraframe is a trading name of Ultraframe UK Limited ww...

Reviews: