ZTF TILLER SYSTEM
-
page 17
of 27
Installation manual
The bracket must be oriented as shown in the picture.
Apply grease to the screw shafts before tightening the nuts.
3.4 Installation with 90-115-130 HP Yamaha ® engines from 2015 to date
As reported on the previous pages, the ZTF installation
with 90-115-130 HP engines from 2015 requires the use
of KIT ND1 (see also par. 2.2).
1
Fasten bracket (1) on device (2) using screws (3) and nuts (4) after having properly placed washers
(5). Lock using 2 18mm wrenches with a tightening torque of 80
Nm (59 lb.-ft.).
NECESSARY TOOLS
2
Screw and lock the studs (7) to the engine arm (6)
following the tightening torque and the instructions
contained in the manual of Yamaha
®
tiller handle
.
(2 x) Open end
wrench
18mm
Torque
wrench
MOLYKOTE
®
1000
CAUTION
CAUTION
1
2
3
4
5
KIT ND1
1
3
5
4
7
9
1 0
1 1
Open end
wrench 9/16"
Open end
wrench
14mm
7
6