background image

INSTALLATION MANUAL

USB 24/30 KIT

Notice 

1. Consult or hire professionals in your area for your installation, the lightening arrester

should be considered in installation. 

2. The system has to be mounted facing NORTH.
3. All exposed piping should be insulated properly to prevent heat loss and provide freezing

protection.

4. Any modifications on the structures of water heater might lead to problems during service..

3/3 Techno Park Drive Williamstown North VIC Australia 3016 

Phone: 03 9397 3993 Fax: 03 9397 3994 

Email: 

[email protected]

 

Web: www.ultimatesolar.com.au 

CAUTION

When working with this equipment:

Shut off water supply to prevent scalding and burning

Summary of Contents for USB 24

Page 1: ...should be insulated properly to prevent heat loss and provide freezing protection 4 Any modifications on the structures of water heater might lead to problems during service 3 3 Techno Park Drive Wil...

Page 2: ...the heat pipe by an aluminium fin The liquid in the heat pipe changes into vapour which rises to the condenser The heat conducts the water inside the Header pipe and the vapour becomes liquid returnin...

Page 3: ...060 130 130 2060 130 130 2440 130 130 2440 130 130 Weight of the Collector KG 44 60 62 80 69 90 84 20 105 40 Size of the Collector mm 1110 2060 1590 2060 1750 2060 2070 2060 2550 2060 Insulation Rock...

Page 4: ...ck leg SUS201 3 Diagonal bar SUS201 4 Diagonal bar of upright support SUS201 5 Bazi bar SUS201 6 Top reflector bar SUS201 7 Baseboard SUS201 8 The manifold Aluminum 9 Heat Pipe Boron silicon3 3 10 The...

Page 5: ...and hot water mixing If the outflow rate is limited within 8L min through a lot of testing such phenomenon is not obvious Transport and operation instruction Packaging and placement Requirements 1 Th...

Page 6: ...e bar 7 Baseboard 8 The manifold 9 Heat pipe 10 The bottom holder of the heat pipes 11 The bottom support Screws M8X16 M6X25 M6X45 Parts included 1 The front leg 2 The back leg 3 Side diagonal bar 4 D...

Page 7: ...ure below Using the M8 16 screws to connect the upper rail with the three front legs and also fix the upper rail with the left and right front legs by u Splayed Bracing Using the M6 45 screws to conne...

Page 8: ...legs with the link parts And install the bottom support on the bottom of the front legs Put the plastic holder of the heat pipes in the bottom support Fasten the baseboard on the front legs with the...

Page 9: ...connect each solar collector with its 22mm size head Then connect the other side of the connector with pipeline The same kind of connecting shall be carried out between all the collectors needed Para...

Page 10: ...and expansion bolts into the confirmed position of the roof 4 Firm the screw under the hole and insert the mounting nail through the hole on front legs and the expansion bolts into the hole on baseboa...

Page 11: ......

Page 12: ...disinfecting agents please note the instruction and using quantity Lightning protection procedures Place a lightning rod using metal frame to avoid the thunder the lightning rod should have a suitabl...

Reviews: