Oil Burner and Controls Start-Up and Adjustment

INDOOR CHIMNEY VENTED BOILERS

Instruction manual enclosed in burner carton must be

followed in regard to start-up and adjustment

1. Standard Beckett AFG or CF375 Oil Burner

A Beckett model AFG oil burner is normally supplied with boilers

to be fired at 2.00 gph or less. It is equipped with an F3 flame

retention head, the size most commonly used. It is possible the

head  must  be 

changed  to  match  the  nozzle  firing  rate

required, 

and it is recommended the installer carry a complete

assortment of Beckett flame retention heads. When head ratings

overlap,  a  smaller  head  with  air  shutter  fairly  well  open  will

generally provide better combustion than a larger head with air

shutter near closed. See head size selection chart on page 16.

For Beckett burners at firing rates above 2.00 gph, a Beckett

model CF375 burner is required, and is supplied if specified by

purchaser.

2.

Optional Riello 40 Series Oil Burner

Riello 40 series oil burner is optional. Model F5 is used for firing

rates from 0.90 to 1.50 gph, and Model F10 is used for firing

rates from 1.60 to 3.00 gph. Model F5 or F10 is supplied if

specified by purchaser. For firing rates below 0.90 gph, a Model

F3 is required, and must be purchased from a Riello distributor.
SUGGESTED  NOZZLES,  HEADS, AND  PRELIMINARY

SETTINGS FOR VARIOUS FIRING RATES AND BURNERS

ARE SHOWN ON PAGES 40 AND 41.

3. On knockdown boilers, 

the  burner  is  not  supplied  with  a

nozzle. 

The correct nozzle is the smallest which will do the job

properly. Long continuous runs with minimum starts and stops

conserve the most energy. The nozzle which provides the highest

C02 with the least smoke for a particular application is always

recommended.  Beckett  Oil  burners  are  supplied  with  pump

pressure set at 140 psi. Nozzle output will be approximately

18%  greater  than  that  at  100  psi.  Pump  pressure  on  Riello

burners should be adjusted according to settings on page 41.

4. WARNING:  Too  low  a  firing  rate  can  cause  excessive

condensation  within  the  boiler  and  chimney  resulting  in

severe rust and corrosion. A piping by-pass is recommended to

minimize this problem. See page 14.

15

5. If Beckett AFG burner is to be fired at less than 1.00 gph, it is

possible that a low firing rate baffle will be required. For firing

rates not specified on page 40, see chart below on which an

“x” indicates that a baffle is necessary. See also instruction

sheet with baffle in burner carton.

6. Using three acorn nuts, studs and washers from hardware

package, fasten burner to mounting plate.

7. Mount L8151 control on boiler jacket above and to the right

of burner using sheet metal screws in holes located in jacket.

Wiring harness is provided. When well is used at the rear of

a larger boiler, it might be necessary to relocate the control

with longer wiring not provided.

8. If the boiler is equipped with a tankless coil, insert well for

the L8151 remote bulb in coil plate. Run capillary tube through

sight glass opening in jacket.

9. If a tankless coil is not used, install 3/4" well and bulb with a

bushing either in the 1 1/2" supply opening opposite the one

used to feed radiation, or in a reducing tee in the 1 1/2" supply

opening that actually feeds radiation.

10. Wiring  diagram  is  found  on  page  16. To  avoid  excessive

condensation, do not use a two-stage thermostat or other

fuel saving devices or techniques without first contacting the

factory.

11. BEFORE MAKING CONTROL ADJUSTMENTS, verify that

all fuel, water and electrical connections have been made in

accordance  with  the  regulations  of  the  National  Fire

Prevention Association, the National Electrical Code and/or

local regulations.

12. See page 14 for control settings.
13.

Start-Up and Adjustment: 

Start and adjust burner according

to manufacturer’s instructions contained in burner carton or

included with packaged boiler, and pay special attention to

the following:
a. As the name suggests, this boiler is designed to produce

the ultimate in useable heat from a gallon of fuel oil. To

adjust the air-fuel mixture by eye is to waste fuel and

create soot.

b.

Repeat  -  Do  not  adjust  air  by  eye.

 Any  time  air

adjustment or oil rate is changed, combustion 

must

 be

checked with instruments.

c. With chamber fully warmed up, find the highest C02 level

at which zero smoke can be maintained. Then add extra

air until C02 falls off 1%. Final setting should be at least

11%  C02.  If  unable  to  obtain  that  reading,  check  for

internal oil leaks, incorrect flame retention head or a faulty

or incorrect nozzle. (See charts on page 16.) Draft will

vary as air is adjusted. It should be left at as near zero

as possible at breeching.

Complete installation must be made in accordance with the

requirements  of  local  authorities  and  the  National  Fire

Protection Association

HEAD

FIRING RATE, GPH

LOW FIRE BAFFLE

.50

X

.65

X

.75

.75

X

.85

X

.90

1.00

.85

X

.90

X

1.00

F0

F3

F6

Summary of Contents for PF Series

Page 1: ......

Page 2: ......

Page 3: ...60 74 64 87 5 88 23 4 6 14 Maximum 1 35 159 138 83 3 83 91 4 6 14 Minimum 75 93 81 87 5 88 23 5 6 17 Maximum 1 70 199 173 83 9 84 63 5 6 17 Minimum 1 05 130 113 87 6 88 24 7 7 24 Maximum 2 35 276 240...

Page 4: ......

Page 5: ...Minimum 95 112 97 82 8 88 25 Maximum 2 10 239 208 79 6 85 20 6 One 37 7 Minimum 1 10 129 112 82 4 88 22 Maximum 2 50 294 256 7 Two 44 3 Minimum 1 25 147 128 82 7 88 15 Maximum 2 75 309 268 8 One 44 3...

Page 6: ......

Page 7: ......

Page 8: ......

Page 9: ......

Page 10: ...with 130 square inches of FREE opening Metal grilles have about 60 FREE area To find the louvered area needed multiply the FREE area required by 1 7 130 x 1 7 221 0 sq in louvered area In this exampl...

Page 11: ......

Page 12: ......

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ...chart below on which an x indicates that a baffle is necessary See also instruction sheet with baffle in burner carton 6 Using three acorn nuts studs and washers from hardware package fasten burner to...

Page 18: ......

Page 19: ...SETTINGS FOR VARIOUS FIRING RATES ARE SHOWN ON PAGE 40 2 At firing rates above 2 00 gph a special Beckett model CF375 burner must be used and is supplied if specified by purchaser 3 Post purge oil bur...

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ......

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ...rate is changed combustion must be checked with instruments With chamber fully warmed up find highest C02 level at which zero smoke can be maintained Then add extra air until C02 falls off about 1 Fin...

Page 29: ......

Page 30: ......

Page 31: ......

Page 32: ......

Page 33: ......

Page 34: ......

Page 35: ......

Page 36: ......

Page 37: ...DQNOHVV RLO LW 6LQJOH 3DVV QFOXGHV DQG 7DQNOHVV RLO 7Z R 3DVV 7DQNOHVV RLO LW 7Z R 3DVV QFOXGHV DQG 7DQNOHVV RLO DVNHW ODQN RLO 3ODWH 66 6WXG UHT G 1 XW H 6HUUDWHG 6 6 6LJKW ODVV VVHPEO RLO 6HFWLRQ 6W...

Page 38: ......

Page 39: ......

Page 40: ...1260006 Temperature Pressure Gauge 6 1060002 3 4 x 1 4 Bushing 7 146 22 011 3 4 ASME Relief Valve 8 146 07 202 3 4 x 4 1 2 Nipple 9 146 07 012 1 1 4 x 10 Nipple Except Models 7TT 8T 9 9 146 07 206 1 1...

Page 41: ......

Page 42: ...1 00 80 A F 6 1 1 8 No 10 1 AFG 1 70 1 50 80 A F12 1 1 8 No 10 3 AFG DPFO 7 1 00 90 80 B F 3 1 1 8 No 10 0 AFG 1 60 1 35 80 B F12 1 1 8 No 10 1 AFG 2 35 2 00 60 B SV1 3 No 10 2 5 CF375 DPFO 9 1 35 1 2...

Page 43: ......

Page 44: ...14683825 Rev 2 May 2003...

Reviews: