52
BMK CLIMBING BRACKETS
4.
Hit the wedge with a hammer to block the Roll-Back Carriage.
Unblocked Roll-Back Carriage
Blocked Roll-Back Carriage
3.7.2.
Tilt-Back MK-120
The formwork is joined to the main platform through the Tilt-Back MK-120(1991467). The panels can be separated
from the poured concrete wall to a distance of about 5 cm.
For stripping the screw jack (24 mm width across flats) is adjusted which causes the mobile nut to slide along the
slot. The Pin D32 inserted into the mobile nut and connected to the vertical waler drags the vertical waler with the
attached formwork away from the wall.
CONCRETE POURING
POSITION
STRIPPING
POSITION
Summary of Contents for BMK-170
Page 1: ... User Guide BMK Climbing brackets 02FIR12 ...
Page 32: ... 32 BMK CLIMBING BRACKETS 1 2 3 4 5 6 7 8 ...
Page 34: ... 34 BMK CLIMBING BRACKETS 1 2 3 4 5 6 7 8 ...
Page 35: ... 35 BMK CLIMBING BRACKETS 9 10 11 ...
Page 36: ... 36 BMK CLIMBING BRACKETS 12 13 14 ...
Page 39: ... 39 BMK CLIMBING BRACKETS 5 6 7 1 2 3 4 ...
Page 40: ... 40 BMK CLIMBING BRACKETS 11 12 13 8 9 10 ...
Page 41: ... 41 BMK CLIMBING BRACKETS 14 15 16 ...
Page 42: ... 42 BMK CLIMBING BRACKETS 17 18 19 ...
Page 75: ... 75 BMK CLIMBING BRACKETS 8 APPENDICES 8 1 DECLARATION OF CONFORMITY LIFTING HOOK MK ...