6m - series
ECONOMY Prime
4
Step 4.
Attach the legs on the other side. Make sure, that the leg pipes are in vertical position, to avoid overtention
on another side.
Use the big ground pegs (11) to fasten the legs to the ground. Attach the side covers to the pipes (3) using hooks
(17).