S9500-30XS Hardware Installation Guide | 27
The following are NEBS GR-1089-CORE cautions, regulatory compliance statements and
requirements:
Caution:
This product is DC-I type (Isolated DC return) of DC power supply. The DC return
line must be grounded to protective earth ground at the power source.
Caution:
The intra-building ports listed below are suitable for connection to intra-building
or unexposed wiring or cabling only. These intra-building ports of the equipment or
subassembly must not be metallically connected to interfaces that connect to the OSP or its
wiring for more than 6 meters (approximately 20 feet). These interfaces are designed for
use as intra-building interfaces only (Type 2, 4, or 4a ports as described in GR-1089) and
require isolation from the exposed OSP cabling. The addition of Primary Protectors is not
sufficient protection in order to connect these interfaces metallically to an OSP wiring
system.
•
OOB port
•
Type A USB port
•
Console port
•
BITS port
•
TOD part
Caution:
The intra-building ports listed below must use shielded intra-building
cabling/wiring that is grounded at both ends.
•
1PPS In/Out port
•
10MHz In/Out port
This product can be installed in Outside Plant (OSP), network telecommunication facilities or locations
where the National Electric Code applies.
Under room temperature environment, the system takes about 2.5 minutes to boot into Diagnostic
Operating System since system power-on. In lower temperature environment, due to extra heating time
of BMC, the system boot up time is around 7 minutes.
Warranty label
Lost of warranty repairs, if removed or ripped the warranty sticker. The warranty sticker as shown in the
following illustration.