background image

2

airGrid

 AGM2-HP-1114 Quick Start Guide

Installation Requirements

•  10 mm wrench
•  Shielded Category 5 (or above) cabling should be used for all 

wired Ethernet connections and should be grounded through 

the AC ground of the PoE.
We recommend that you protect your networks from the 
most brutal environments and devastating ESD attacks 
with industrial-grade shielded Ethernet cable from Ubiquiti 
Networks

. For more details, visit www.ubnt.com/toughcable

Hardware Installation

1.  Attach the Feed Support and L Bracket to the Grid Reflector.

a.  Orient the Grid Reflector for the appropriate polarization, 

horizontal or vertical.

WARNING:

 The polarization of the airGrid must match 

the polarization of its corresponding device (horizontal 
to horizontal, vertical to vertical).

b.  With the cable opening facing down, insert the Feed Support 

into the Grid Reflector and L Bracket.

c.  Secure the Feed Support and L Bracket to the Grid Reflector 

with the four M6x20 Bolts, four M6 Lock Washers, and four 

M6 Washers.

Horizontal Polarization

Vertical Polarization

Summary of Contents for air Grid M2 AGM2-HP-1114

Page 1: ...2 2 4 GHz High Performance Integrated InnerFeed Antenna Model AGM2 HP 1114...

Page 2: ......

Page 3: ...tents 2 2 4 GHz High Performance Integrated InnerFeed Antenna Model AGM2 HP 1114 11x14 Grid Reflector Antenna Feed Feed Support Quick Start Guide L Bracket Pole Clamp M6 U Bolt M6x20 Bolts Qty 4 M6 Se...

Page 4: ...visit www ubnt com toughcable Hardware Installation 1 Attach the Feed Support and L Bracket to the Grid Reflector a Orient the Grid Reflector for the appropriate polarization horizontal or vertical W...

Page 5: ...3 Hardware Installation 2 Route an Ethernet cable through the cable opening of the Feed Support and connect it to the Ethernet port on the back of the Antenna Feed...

Page 6: ...Horizontal Polarization Vertical Polarization WARNING The orientation of the Antenna Feed and Grid Reflector must match the orientation required for your signal polarization horizontal or vertical 4 W...

Page 7: ...commodate a 1 25 2 2 pole a Ensure that the cable opening of the Feed Support faces down b Insert the M6 U Bolt into the Pole Clamp and L Bracket c Secure the M6 U Bolt with two M6 Serrated Flange Nut...

Page 8: ...he Ethernet cable from the airGrid to the Ethernet port labeled POE on the PoE Adapter 2 Connect an Ethernet cable from your LAN to the Ethernet port labeled LAN on the PoE Adapter 3 Connect the Power...

Page 9: ...static IP address on the 192 168 1 x subnet 3 Launch your web browser and type http 192 168 1 20 in the address field Press enter PC or return Mac 4 The login screen will appear Enter ubnt in the User...

Page 10: ...ler Compliance Responsibility Devices must be professionally installed and it is the professional installer s responsibility to make sure the device is operated within local country regulatory require...

Page 11: ...1 5 1 Wind Survivability 125 mph Wind Loading 5 lbf 100 mph ETSI Specification EN 302 326 DN2 Shock and Vibration ETSI300 019 1 4 Certifications FCC IC CE Operating Temperature 30 to 75 C Operating H...

Page 12: ...Building installation shall provide appropriate short circuit backup protection e Protective bonding must be installed in accordance with local national wiring rules and regulations General Warranty U...

Page 13: ...uct has been properly installed and used at all times in accordance and in all material respects with the applicable Product documentation IV All Ethernet cabling runs use CAT5 or above shielded cabli...

Page 14: ...r users the antenna type and its gain should be so chosen that the equivalent isotropically radiated power e i r p is not more than that permitted for successful communication This device complies wit...

Page 15: ...if a restriction on use applied to the product and it must follow the CE marking RoHS WEEE Compliance Statement English European Directive 2002 96 EC requires that the equipment bearing this symbol o...

Page 16: ...ad suya desechar este y cualesquiera otros aparatos el ctricos y electr nicos a trav s de los puntos de recogida que ponen a su disposici n el gobierno y las autoridades locales Al desechar y reciclar...

Page 17: ...ice overholder de v sentlige krav og vrige relevante krav i direktiv 1999 5 EF Nederlands Dutch Hierbij verklaart UBIQUITI NETWORKS dat het toestel UBIQUITI NETWORKS device in overeenstemming is met d...

Page 18: ...evanti li hemm fid Dirrettiva 1999 5 EC Norsk Norwegian UBIQUITI NETWORKS erkl rer herved at utstyret UBIQUITI NETWORKS device er i samsvar med de grunnleggende krav og vrige relevante krav i direktiv...

Page 19: ......

Page 20: ...Email support ubnt com Phone 9 a m 5 p m PST 408 942 1153 Online Resources Wiki Page wiki ubnt com Support Forum forum ubnt com Downloads downloads ubnt com w w w u b n t c o m 2012 Ubiquiti Networks...

Reviews: