![UAB NAVITUS LT MCL 5 IP User Manual Download Page 12](http://html.mh-extra.com/html/uab-navitus-lt/mcl-5-ip/mcl-5-ip_user-manual_832271012.webp)
12
4. Installation
Important:
Before proceeding, please ensure the device will remain clean and dry
during the installation and no liquid or other substance will remain inside as that could
severely affect device performance and warranty.
Important:
Allowed bolt head diameter can be from 6 to 7,5 mm and the body diameter
from 3,4 to 4 mm. A set of mounting bolts are supplied with the controller
Important:
PIN code of a SIM card must be disabled prior the installation
4.1. Installation Steps:
a) Unscrew 4 bolts at each corner holding the transparent cover and take the cover off
b) Controller can be mounted on a wall using four mounting holes (indicated below) at the corners of the
device. Position the device vertically so that the face of the device is clearly visible for led indication and
connection interfaces are easily accessible
c) Place the controller in the desired location and screw in the mounting bolts through the mounting holes.
d)
Insert the SIM card firmly into the dedicated slot
e)
Gently place the SIM card in a slot marked “SIM” on the main face until it reaches the back of the slot.
Check if the SIM card is secured inside. Connect the controller to the voltage network.
f)
Unscrew the cable gland cap and pass the external antenna cable, meter cable and/or optical read-out
head cable and other required cables through the cap first
g)
Connect required meter or optical read-out head device to the required connectors as per paragraph 4.1
and manufacturer’s instructions