22
4. Place an empty sample pan on the sample pan holder and ensure it is
laid flat.
5. Close the heater cover and tare by pressing the
“
TARE
”
button.
6. Open the heater cover and place the sample evenly on the sample
pan.
7. Close the heater cover and start drying by pressing
“
START/STOP
”
.
* During the drying process, the current temperature, time and
temporary results will be continuously updated and displayed.
8. When the drying is completed, an audible signal will sound and the
result will be displayed.
9. Press the
“
CONVERSION
”
button to switch to different displays of
results.