13
4.3 Installing parts
Procedure:
1. Lift the cover straight up
2. Install the draft shield
Place the draft shield into the sample chamber. Align it with the hole.
3. Install the sample pan holder
Place the pan holder on the axis of the moisture analyzer main unit.
Align the pan holder with the draft shield, and insert them onto the
bottom.
4. Place the sample pan handle
5. Place a sample pan
Place a sample pan on the pan holder so that the brim of the holder can
secure the sample pan.
4.4
Leveling the moisture analyzer
Accurate horizontal positioning is a necessary condition for repeatable
measurements and exact results. To compensate for small irregularities
or tilts at this location, the instrument needs to be leveled.