50
TABLE 3: TWO-STAGE UNITS (3450 RPM) -
TWO PIPE SYSTEMS
TABLE 4: SINGLE-STAGE UNITS (3450 RPM) -
TWO PIPE SYSTEMS
Figure 27: Two Pipe Oil Lines
C
.
TWO PIPE OIL LINES
)RUWZRSLSHGV\VWHPVZKHUHPRUHOLIWLVUHTXLUHG
WKHWZRVWDJHIXHOXQLWLVUHFRPPHQGHG
7DEOHWZRVWDJHDQG7DEOHVLQJOHVWDJHVKRZ
DOORZDEOHOLIWDQGOHQJWKVRILQFKDQGLQFK
2'WXELQJIRUERWKVXFWLRQDQGUHWXUQOLQHV5HIHU
WR)LJXUH
Lift "H"
(See Fig. 25)
Maximum Length of Tubing
"H" + "R" (See Figure 27)
3/8" OD
Tubing (3 GPH)
1/2" OD
Tubing (3 GPH)
0'
93'
100'
2'
85'
100'
4'
77'
100'
6'
69'
100'
8'
60'
100'
10'
52'
100'
12'
44'
100'
14'
36'
100'
16'
27'
100'
18'
---
76'
Lift "H"
(See Fig. 25)
Maximum Length of Tubing
"H" + "R" (See Figure 27)
3/8" OD
Tubing (3 GPH)
1/2" OD
Tubing (3 GPH)
0'
84'
100'
1'
78'
100'
2'
73'
100'
3'
68'
100'
4'
63'
100'
5'
57'
100'
6'
52'
100'
7'
47'
100'
8'
42'
100'
9'
36'
100'
10'
31'
100'
11'
26'
100'
12'
21'
83'
13'
---
62'
14'
---
41'
SECTION X: OIL PIPING (continued)
Summary of Contents for V8H5
Page 76: ...76 Bare Boiler Assembly Continued SECTION XVI REPAIR PARTS continued ...
Page 78: ...78 Jacket Assembly SECTION XVI REPAIR PARTS continued ...
Page 80: ...80 V8H3 Thru V8H9 Steam Boilers Trim and Controls SECTION XVI REPAIR PARTS continued ...
Page 82: ...82 V8H3 Thru V8H9 Water Boilers Trim and Controls SECTION XVI REPAIR PARTS continued ...
Page 84: ...84 Beckett AFG Burner SECTION XVI REPAIR PARTS continued ...
Page 94: ...94 SERVICE RECORD DATE SERVICE PERFORMED ...
Page 95: ...95 SERVICE RECORD DATE SERVICE PERFORMED ...
Page 96: ...96 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...