91
APPENDIX B - FIGURES
Figure
Number
Page
Number
Description
6HFWLRQ,3URGXFW'HVFULSWLRQ6SHFL¿FDWLRQ GLPHQVLRQDO'DWD
Figure 1A
6
V8H3 thru V8H9 Water Boiler without Tankless Heater
Figure 1B
7
V8H3 thru V8H9 Water Boiler with Front Tankless Heater
Figure 1C
8
V8H3 thru V8H9 Water Boiler with Rear Tankless Heater
Figure 1D
9
V8H3 thru V8H9 Steam Boiler with or without Tankless Heater
Section II - Pre-Installation
Figure 2
10
Minimum Installation Clearances To Combustible Materials (Inches)
Section III - Knockdown Boiler Assembly
Figure 3
12
Knockdown Boiler Removal from Skid
Figure 4
12
Boiler Canopy Installation
Figure 5
13
Boiler Tapping Locations and Usage (Knockdown Boilers Only)
Figure 6
14
Knockdown Boiler Jacket Assembly
Figure 7
15
Oil burner Installation (Beckett Burner Shown)
Figure 7A
18
Combustion Head Adjustment - 102CRD Burner
Figure 7B
18
Installation/Removal of Riello Drawer Assembly
Figure 7C
19
Riello Nozzle Replacement
Figure 7D
19
Riello Turbulator Setting
Figure 7E
19
5LHOOR3XPS&RQQHFWLRQVDQG3RUW,GHQWL¿FDWLRQ
Figure 8
21
Limit Sensor Insertion
Figure 9
22
Float-Type Low Water Cut-Off and Pressure Limit Installation
Figure 10
22
Pressure Limit Installation for Probe LWCO Equipped Boilers
Figure 11
23
Burner Disconnect Junction Box with Power Outlet Receptacle
Section IV - Packaged Boiler Assembly
Figure 12
24
Packaged Boiler Removal from Skid
Figure 13A
25
Partial Front View - Burner Swing Door Mounted to Boiler - Fully Closed and Secured
Figure 13B
26
Top View - Burner Swing Door Mounted to Cast Iron Block Assembly (Jacket Removed for Clarity)
Figure 13C
27
Top View - Burner Swing Door Fully Closed but Not Properly Secured or Sealed
Section V - Water Boiler Piping and Trim
Figure 14
29
Recommended Piping for Combination Heating and Cooling (Refrigeration) System
Figure 15A
30
Recommended Water Piping for Circulator Zoned Heating System - Supply Side Circulators
Figure 15B
31
Recommended Water Piping for Zone Valve Zoned Heating System - Supply Side Circulator
Section VI - Steam Boiler Piping and Trim
Figure 16
33
Recommended Boiler Piping for Gravity Return Steam Boiler
Section VII - Tankless and Indirect Water Heater Piping
Figure 17A
35
Schematic Tankless Heater Piping
Figure 17B
36
Indirect Domestic Water Heater Piping with V8H Steam Boiler
Section VIII - Venting and Air Intake Piping
Figure 18
38
Recommended Vent Pipe Arrangement and Chimney Requirements
Figure 19
38
Proper and Improper Locations of Draft Regulator
Figure 20
39
Optional Air Intake Piping Installation - Only Available with Beckett Burner
Summary of Contents for V8H3
Page 76: ...76 Bare Boiler Assembly Continued SECTION XVI REPAIR PARTS continued...
Page 78: ...78 Jacket Assembly SECTION XVI REPAIR PARTS continued...
Page 80: ...80 V8H3 Thru V8H9 Steam Boilers Trim and Controls SECTION XVI REPAIR PARTS continued...
Page 82: ...82 V8H3 Thru V8H9 Water Boilers Trim and Controls SECTION XVI REPAIR PARTS continued...
Page 84: ...84 Beckett AFG Burner SECTION XVI REPAIR PARTS continued...
Page 94: ...94 SERVICE RECORD DATE SERVICE PERFORMED...
Page 95: ...95 SERVICE RECORD DATE SERVICE PERFORMED...
Page 96: ...96 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...