10
Figure 2: Minimum Installation Clearances To Combustible Materials (Inches)
A.
INSPECT SHIPMENT
carefully for any signs of
damage.
1. All equipment is carefully manufactured, inspected
and packed. Our responsibility ceases upon delivery
of crated boiler to the carrier in good condition.
2. Any claims for damage or shortage in shipment
must be filed immediately against the carrier by the
consignee. No claims for variances from, or shortage
in orders, will be allowed by the manufacturer
unless presented within sixty (60) days after receipt
of goods.
B.
LOCATE BOILER
in front of final position before
removing crate. See Figures 1A thru 1D.
1. LOCATE so that vent pipe connection to chimney
will be short and direct.
2. BOILER IS SUITABLE FOR INSTALLATION
ON COMBUSTIBLE FLOOR. Boiler cannot be
installed on carpeting.
3. FOR BASEMENT INSTALLATION, provide
a solid elevated base, such as concrete, if floor is
not level, or if water may be encountered on floor
around boiler.
4. PROVIDE SERVICE CLEARANCE of at least
24” clearance from front jacket panel for servicing
and removal of front tankless heater (increase to
30" for #A54 heater). If boiler is equipped with
a rear tankless heater, provide at least 24" service
clearance on the right side of the boiler. Boiler
flueways may be cleaned either from the top
or
from
the right side. Provide at least 24" clearance from
either the right side of the boiler
or
the top of the
boiler for cleaning flueways.
5. For minimum clearances to combustible materials.
See Figure 2.
NOTICE
Clearance to venting is for single wall vent
pipe. If Type L vent is used, clearance may be
reduced to the minimum required by the vent pipe
manufacturer.
SECTION II: PRE-INSTALLATION
NOTES:
1. Listed clearances comply with American
National Standard ANSI/NFPA 31, Installation of
Oil Burning Equipment.
2. V8H Series boilers can be installed in rooms with
clearances from combustible material as listed
above. Listed clearances cannot be reduced for
alcove or closet installations.
3. For reduced clearances to combustible material,
protection must be provided as described in the
above ANSI/NFPA 31 standard.
Summary of Contents for V8H SERIES
Page 76: ...76 Bare Boiler Assembly Continued SECTION XVI Repair Parts continued ...
Page 78: ...78 Jacket Assembly SECTION XVI Repair Parts continued ...
Page 80: ...80 V8H3 Thru V8H9 Steam Boilers Trim and Controls SECTION XVI Repair Parts continued ...
Page 82: ...82 V8H3 Thru V8H9 Water Boilers Trim and Controls SECTION XVI Repair Parts continued ...
Page 84: ...84 Beckett AFG Burner SECTION XVI Repair Parts continued ...
Page 94: ...94 SERVICE RECORD DATE SERVICE PERFORMED ...
Page 95: ...95 SERVICE RECORD DATE SERVICE PERFORMED ...
Page 96: ...96 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...